
Rule Curve
April 11, 2022
Runner
April 11, 2022A mode of hydropower operation where the outflow from a project matches the inflow to the impoundment. on an instantaneous, hourly, or other time basis.




A mode of hydropower operation where the outflow from a project matches the inflow to the impoundment. on an instantaneous, hourly, or other time basis.