LIHI Certificate #78 - Slack Dam Project, Vermont

项目名称 Slack
LIHI 证书编号 78
LIHI 证书期限 February 28, 2016 – February 28, 2029
所有者 Springfield Hydroelectric Company
状态 佛蒙特
地点 Located at river mile 4.3 on the Black River in Springfield, Vermont.
装机容量 0.4 MW
平均年发电量 2,000 MWH
设施类型 径流式 with a de minimus bypass
联邦能源管理委员会 不。 P-8014 exempt 1985

The Slack Dam Project is located in Springfield, Vermont on the Black River. The is one of five existing concrete gravity dams on the Black River. The project is served by a 190 square mile drainage area on the Black River, 75% of which is controlled by the U.S. Army Corps of Engineers Flood Control Project in North Springfield, 4.5 miles upstream. Dams farther upstream include Cavendish (LIHI #97). Additionally, the Comtu Falls Project (LIHI #124) is located directly upstream and the Lovejoy Dam is directly downstream.

The project was reconstructed in 1986 and includes: a concrete 重力坝, 发电站, 压力水管, and one horizontal Kaplan turbine with a capacity of 0.4 MW. The powerhouse is integral to the dam and constructed of reinforced concrete to an elevation greater than the 100-year flood level. A steel penstock 8 feet in diameter and 80 feet in length conducts water from the intake to the powerhouse.

该项目采用 径流 mode and impounds a 1-acre reservoir. The project provides a minimum flow of 0.5-inches of spillage over the crest of the dam. This flow regime was developed in consultation with the Vermont Department of Environmental Conservation (VDEC).

Waters within the project reach are designated as “Good” with the exception of a 2.5-mile stretch downstream just above the confluence with the Connecticut River as it is impaired for municipal sewer discharges.

Downstream 鱼道 is facilitated by a downstream chute cut into the dam along with a sluice and slide. This passage is now operated as requested by VDEC during the spring and fall seasons to protect resident fish species.

PLUS-标准型: The project voluntarily operates its downstream fish passage from April 1 through June 15 and from September 15 through November 15 or as otherwise requested by state fisheries agencies.

The project lands consist of roughly 1 acre. The impoundment has some tree-lined shoreline, but the project is primarily surrounded by industrial buildings in the urban downtown of Springfield, VT. No lands of significant ecological value exist in the project area.

As confirmed by US Fish and Wildlife Service, there are not any federally or state listed species in the project area or downstream reach of the project.

Historical resources in the project area include the Slack Chimney, a National Register listed property. The project owner consults with the State Historic Preservation Office to ensure protection of the property.

Recreational resources at the project include pedestrian fishing access. Informal recreation also occurs at the project and is provided free of charge.


合规状态

该证书包括以下针对设施的特定条件:

条件 1. If either the U.S. FWS or the state fisheries management agency requires the facility to provide upstream eel passage in the future, the owner shall notify LIHI within 30 days of receipt of such a notification. The owner shall then consult with the requesting agency to develop plans to implement such upstream passage and provide LIHI with a copy of these plans no later than one year after receiving the notification.

条件 2。 For the full term of the LIHI certification, the owner shall continue to operate the downstream 鱼道 at Slack Dam in the spring from April 1 to June 15 and in the fall from September 15 to November 15 or as otherwise requested by the state fisheries agency. This condition is associated with the 8-year extended term of the new certificate.

2024: No material changes or compliance issues were identified. The project remains in compliance based on the annual review. The project reported no changes in status of Condition 1 and 2.

2023: No material changes or compliance issues were identified. The project remains in compliance based on the annual review. For Condition 1, the project reported no requests for eel passage. For Condition 2, the project reported the fishway was operated as required.

2022: No material changes or compliance issues were identified. The project remains in compliance based on the annual review. For Condition 1, the project reported no requests for eel passage. For Condition 2, the project reported the fishway was operated as required.

2021: There were no reported changes or compliance issues, and no changes in condition status. For Condition 2, the downstream fishway was operational as required. The project remains in compliance based on the annual review.

2020: There were no reported changes or compliance issues, and no changes in condition status. For Condition 2, the downstream fishway was operational as required. The project remains in compliance based on the annual review.

2019: There were no reported changes or compliance issues, and no changes in condition status. For Condition 2, the downstream fishway was operational as required. The project remains in compliance based on the annual review.

2018: There were no reported changes or compliance issues, and no changes in condition status. For Condition 2, the downstream fishway was operational as required. The project remains in compliance based on the annual review.

2016-2017: 当前证书的年度报告尚未生效。


认证历史

2022 年 1 月 1 日: LIHI 证书期限已根据 2022 年 1 月 1 日发布的 LIHI 第 2 版认证手册 2.05 版延长。有关新期限,请参阅上面的设施表。

June 20, 2017: Having received no requests to appeal the preliminary certification decision, Slack Dam Hydroelectric Project received final notice that it satisfies the LIHI certification criteria.

May 11, 2017: The Low Impact Hydropower Institute has issued a Preliminary Certification Decision that the Slack Dam Hydroelectric Project (FERC No. P-8014) satisfies the LIHI Certification Criteria.  This certification qualifies for one PLUS standard on downstream fish passage and protection which extends the standard term from five years to eight years.  Any Commenter may submit a letter to the Executive Director requesting an appeal within the 30-day period.  The appeal request must state specific reasons why the hydropower facility should have failed one or more criteria.  Only individuals or organizations that commented on the initial Application Package may file an appeal.  Further information about the LIHI appeal process is available in the LIHI Handbook. If no appeal is requested within the 30-day period, the Executive Director will issue LIHI Certification for the facility and post a notification of certification on the Institute’s website.  Once final, the effective certification date for the Slack Dam Project is February 28, 2016 for an eight (8) year term, which will expire on February 28, 2024.

March 8, 2017: The Low Impact Hydropower Institute has received a complete application for a new term of Low Impact Certification for the Slack Dam Hydroelectric project. The application materials can be found in the Files section below. LIHI is seeking public comment on this application.  Specifically, we are interested in knowing whether you think the Slack Dam project meets the LIHI Low Impact Certification Criteria, as revised in the 2nd Edition Handbook released in March 2016.  Please review the program and criteria in LIHI’s revised Handbook and then review the Project’s 2016 application materials posted on the project page. Comments that are directly tied to specific LIHI criteria (flows, water quality, fish passage, etc.) will be most helpful, but all comments will be considered.  Comments may be submitted to the Institute by e-mail at comments@lowimpacthydro.org with “Slack Dam Project Comments” in the subject line, or by mail addressed to the Low Impact Hydropower Institute, PO Box 194, Harrington Park, New Jersey 07640.  Comments must be received at the Institute on or before 5 pm Eastern time on May 7, 2017 予以考虑。所有评论都将发布到网站上,申请人将有机会作出回应。任何回应也将发布。

2011年10月27日: The Slack Dam Hydroelectric Project has been certified as low impact for a five year term, effective February 28, 2011 and expiring February 28, 2016.

April 28, 2011: Public comment period has been closed.

2011年2月28日: Springfield Hydroelectric Company has submitted an application for the certification of the Slack Dam Project. Public comment period will be open for 60 days.