14 décembre 2021 : Le Low Impact Hydropower Institute (LIHI) a approuvé de manière préliminaire le projet Benton Falls situé sur la rivière Sebasticook dans le Maine pour une durée de 5 ans. […]
December 8, 2021: The Low Impact Hydropower Institute (LIHI) has received a complete recertification application from Fall River Rural Electric Cooperative for the Buffalo River Project […]
December 1, 2021: The Low Impact Hydropower Institute (LIHI) has preliminarily approved the Willow Island Project located on the Ohio River in Ohio and West Virginia […]
November 30, 2021: The Low Impact Hydropower Institute (LIHI) has preliminarily approved the Goat Lake Project located on Pitchfork Falls Creek in Alaska for a 5-year […]
November 29, 2021: The Low Impact Hydropower Institute (LIHI) has preliminarily approved the Arrowrock Project located on the Boise River in Idaho for a 5-year term […]
November 11, 2021: The Low Impact Hydropower Institute has received a complete application for Low Impact Certification of the Red Rock Project located on the Des […]
5 novembre 2021 : Le Low Impact Hydropower Institute (LIHI) a approuvé de manière préliminaire le projet Gardners Falls situé sur la rivière Deerfield dans le Massachusetts pour une durée de 5 ans. […]
4 novembre 2021 : Le Low Impact Hydropower Institute a rendu une décision finale sur la recertification du projet Penacook Lower Falls situé sur la rivière Contoocook […]
4 novembre 2021 : Le Low Impact Hydropower Institute (LIHI) a approuvé de manière préliminaire les projets Upper et Lower LaChute situés sur la rivière LaChute à New York, […]