LIHI Certificate #198 - Hailesboro No. 4 Project, New York

项目名称 | 海尔斯伯勒 4 号 |
LIHI 证书编号 |
198 |
LIHI 证书期限 |
2023年2月3日-2033年2月2日 |
所有者 | Hydro Development Group Acquisition, LLC——Patriot Hydro. LLC 的子公司 |
状态 | 纽约 |
地点 | River mile 67.7 on the Oswegatchie River, St. Lawrence County, New York |
装机容量 | 1.9 兆瓦 |
平均年发电量 | 10,647 MWh |
设施类型 | 河流径流 |
联邦能源管理委员会 不。 | P-6058. Issued in 2002, expiring 12/31/2032. |
The Hailesboro No. 4 Project (FERC No. 6058) is located on the Oswegatchie River in St. Lawrence County, New York. The 132-mile long Oswegatchie River is located in the St. Lawrence River watershed. The 源头 奥斯威戈奇河位于阿迪朗达克山脉,河流大致向西流,然后向北流,最后流入纽约州奥格登斯堡的圣劳伦斯河。
The project is located at river mile (RM) 67.7 and is the 7th 坝 位于河口上游,是三个相关项目中最下游的一个,其中还包括 海尔斯伯勒 3 号 (LIHI #197) 和 海尔斯伯勒 6 号 (LIHI #199)。该河在黑尔斯伯勒 6 号(岛屿支流)上游分为三支,并在黑尔斯伯勒 3 号下游的项目之间重新汇合。
The project was originally constructed in 1936 and operates under a license issued by the Federal Energy Regulatory Commission on October 30, 2002 which was amended on September 19, 2012, and expires December 31, 2032.
该项目包括:
- a concrete gravity-type dam comprised of the 105-foot-long, 14-foot-high dam #1 surmounted by a 2-foot-high pneumatic 顶门 and the 58-foot-long, 5-foot-high dam #2 surmounted by 2-foot-high wooden 闪光板;
- a reservoir with a surface area of 2 acres and a gross storage volume of 20 acre-feet at normal water surface elevation 461 ft 胃肠疾病 that creates a 0.4-mile-long bypassed reach;
- a gated intake structure with steel trashracks which have 1.75-inch clear spacing;
- a 170-foot-long concrete-lined forebay 运河 with a sluice gate;
- a reinforced concrete and concrete masonry 发电站 containing two horizontally mounted, double runner, Francis-type turbine units; one 900-kW generating unit and one 1,000-kW generating unit for a total installed capacity of 1,900 kW;
- a 2.4/23-kV 变电站, a 50-foot-long, 23-kV transmission line and appurtenant facilities; and
- a 73-foot-long by 3-foot-high concrete gravity 导流 dam (Island Branch Weir), topped with 1-foot-high wooden flashboards, located at the entrance of the Island Branch of the Oswegatchie River.
该项目在 径流 流入量接近流出量且蓄水面高程波动最小的模式。 扣押 drawdowns are limited to no more than 3 inches below the top of the dam flashboards or the dam crest if flashboards are not in place. 径流式 operations and impoundment water surface elevations are monitored in accordance with a Flow Monitoring Plan. Minimum flows of 20 cfs at 坝 #1 and 8 cfs from Dam #2 are provided into the bypassed reach except during walleye spawning season when a combined minimum flow of 105 cfs must be released below the two dams. A minimum flow of 30 cfs is provided to the Island Branch via a notch in the weir. These flow levels were determined by a demonstration flow study conducted at the time of licensing and consultation with the resource agencies.
项目附近的奥斯威戈奇河被指定为A级水。A级水的最佳用途是作为饮用水、烹饪或食品加工的供水,以及初级和 二次接触娱乐和钓鱼。该项目河段未被纽约州环境保护部列为受损河段,径流式作业不会影响水质。
There are no migratory fish in the project reaches due to the presence of several downstream dams as well as natural falls that block upstream fish movement. Resident fisheries of the Oswegatchie River in the Project vicinity consist of a mix of warm and cool water species. The most abundant species captured during the surveys were rock bass, fallfish, and pumpkinseed. The low intake approach velocity of 0.89 ft/second allows most fish to avoid 夹带 in the turbines. In addition, many smaller fish that might not be able to outswim the approach velocities are often small enough to avoid turbine blade strikes and pass through a powerhouse unharmed. Additional fish protection measures included modification of the outflow of the sluice gate to minimize injury to any fish passing downstream via the 20-cfs minimum flow at Dam #1; provision of an adequate 瀑布水潭 (at least 1 foot of depth for every 4 feet of drop), a smooth surface in the bypass sluice, and adequate dispersal of flow through the sluice to provide sufficient depths for safe fish movement; and consultation with Interior and NYSDEC regarding the need for trashracks with a maximum clear spacing of 1 inch when the existing trashracks need replacement, which has not yet occurred.
Project lands encompass about 2 acres for the impoundment and about 0.5 acres surrounding the facility. There are no lands of ecological significance and no critical habitats located in the vicinity. The run-of-river operations and impoundment restrictions limit fluctuations in impoundment water surface elevation that otherwise could contribute to shoreline erosion. Erosion and sediment control measures and monitoring are followed during routine maintenance or construction activities.
The only federally threatened or endangered species that could be present in the project vicinity is the Northern long-eared bat. Several migratory birds may be present in the Project areas and include belted kingfisher, black-billed cuckoo, chimney swift, golden-winged warbler, and wood thrush. The project’s small footprint and lack of need to cut trees limit any potential impacts to these species. Only dead trees around the impoundment may be cut if they pose a hazard to navigation or project operations.
目前尚无已知的地上或考古资源列入或有资格列入 国家历史遗迹名录 in the Project area. No traditional cultural properties have been identified. However, due to the age of the dam and powerhouse, it is possible that they could be eligible for listing, subject to determination of historical relevance. The State Historic Preservation Officer (SHPO) reviewed the project at the time of relicensing and determined that there would be no effect on cultural resources. In the event any archaeological or historic sites are found during operation and maintenance of the Project, the owner consults with the SHPO and preparation of a cultural resources management plan.
Recreational facilities include a car-top boat access in the impoundment and a parking area near the powerhouse that leads to bank fishing access at the Hailesboro No. 3 impoundment. Recreational access is provided free of charge.
合规状态
该证书包括以下针对设施的特定条件:
条件 1. 在向 LIHI 提交的年度合规报告中,设施所有者应提供 Hailesboro 3 号项目下游搬运入口的最新状态,包括与 FERC 和土地所有者联系,了解获取建造搬运入口所需的 Hailesboro 3 号尾水渠附近的土地;或者,如果 Hailesboro 3 号的入口不再相关或必要,所有者应根据 Hailesboro 4 号许可证第 410(2) 条向 FERC 提供问题解决的证明文件。
2025: No material changes or compliance issues were identified. The project remains in compliance based on the annual review. For Condition 1, the project reported one of two abutting landowners who responded is not receptive to allowing portage over their property.
2024: No material changes or compliance issues were identified. The project remains in compliance based on the annual review. For Condition 1, the project reported sending letters to two landowners with no response received yet.
2023: 当前证书的年度报告尚未生效。
认证历史
2023年6月6日: 海尔斯伯勒3号、4号和6号项目的认证已于2023年6月3日申诉期结束后生效,目前尚未收到任何申诉请求。各项目的认证期限为2023年2月3日至2033年2月2日。
2023 年 5 月 4 日: 低影响水电研究所已初步批准海尔斯伯勒 3 号、4 号和 6 号水电项目获得低影响认证。完整申请及审核报告如下。此决定尚待 30 天的申诉期过后才能做出。只有在 60 天的评论期内对初始申请发表意见的人员才有资格提出申诉。此类申诉需要解释项目为何不符合低影响水电研究所 (LIHI) 的标准。申诉请求可以通过电子邮件发送至 comments@lowimpacthydro.org 请将邮件主题填写为“Hailesboro Projects”,或邮寄至低影响水电研究所,地址:1167 Massachusetts Ave, Arlington, MA 02476。所有申请都将发布在网站上。申请人将有机会回复,回复也将发布。 请求必须在 2023 年 6 月 3 日东部时间下午 5 点之前收到。
2023年2月7日: 低影响水电研究所 (LIHI) 已收到一份完整的海尔斯伯勒 3、4 和 6 号水电项目低影响认证申请。LIHI 正在就此申请征询公众意见。具体而言,我们想知道您是否认为该项目符合 LIHI 低影响认证标准(第二版手册中修订版)。请查看 LIHI 修订版中的项目和标准。 手册 然后查看以下项目的申请材料。与特定 LIHI 标准(流量、水质、 鱼道等)将非常有帮助,但所有评论都会被考虑。评论可以通过电子邮件提交给研究所 comments@lowimpacthydro.org 请在主题行中注明“Hailesboro 3、4 和 6 项目评论”,或邮寄至低影响水电研究所,地址为 1167 Massachusetts Avenue, Arlington, MA 02476。 评论必须在 2023 年 4 月 8 日美国东部时间下午 5 点之前收到 予以考虑。所有评论都将发布到网站上,申请人将有机会作出回应。任何回应也将发布。