5 月 1, 2020

Preliminary Decision – Recertification of Ware River, LIHI #47

Lexington MA (May 1, 2020):  The Low Impact Hydropower Institute (LIHI) has preliminarily approved the Ware River Project (LIHI #47) for a new 5-year term of […]
4 月 27, 2020

Bowersock Project, LIHI #15 – Complete Application Received

Lexington MA (April 27, 2020): The Low Impact Hydropower Institute has received a complete application for Low Impact recertification of the Bowersock Hydroelectric Project.   The […]
4 月 13, 2020

Dwight Project – Complete Application Received

Lexington MA (April 13, 2020): The Low Impact Hydropower Institute has received a complete application for Low Impact Certification of the Dwight Hydroelectric Project.  LIHI is […]
2020 年 4 月 7 日

Pawtucket Project, LIHI #11 – Complete Application Received

Lexington MA (April 8, 2020): The Low Impact Hydropower Institute has received a complete application for Low Impact recertification of the Pawtucket Hydroelectric Project.   The […]
2020 年 4 月 7 日

白内障项目 – 已收到完整申请

Lexington MA (April 7, 2020): The Low Impact Hydropower Institute has received a complete application for Low Impact Certification of the Cataract Hydroelectric Project.  The complete […]
zh_CNZH_CN