LIHI Certificate #42 - Dodge Falls Project, Vermont

Nombre del proyecto | Dodge Falls |
Certificado LIHI No. | 42 |
Plazo del certificado LIHI | June 1, 2019 – May 31, 2029 |
Dueño | Dodge Falls Associates, LP, a subsidiary of Essex Hydro Associates, LLC |
Estado | New Hampshire, Vermont |
Ubicación | Located at river mile 264.7 on the Connecticut River in the towns of Bath, New Hampshire and Ryegate, Vermont. |
Capacidad instalada | 5.0 MW |
Generación media anual | 25,707 MWh |
Tipo de instalación | De pasada |
Comisión Federal de Comercio No. | P-8011 exempt 1984 |
The Dodge Falls Project is located on the Connecticut River in the towns of Bath, New Hampshire and Ryegate, Vermont. It is located immediately downstream of the Fifteen Mile Falls Hydroelectric Project (LIHI #39). The hydroelectric station was constructed at the site of the existing Dodge Falls presa. The dam was used until 1966 to provide waterpower to a paper mill located on the Vermont side of the river. From 1966 until 1990 process water was supplied to the paper mill with excess flow discharged over the dam. When the Dodge Falls project began operation in 1990, most of the river flow then was used for hydroelectric generation with the paper mill receiving up to 5 cfs for process use. In 2000, the paper mill was shut down and papermaking machinery was removed from the mill.
The project includes a grouted, rock fill, cuna de madera dam about 15.5 feet tall and 485 feet long, originally constructed in 1905; a 75-foot-long concrete aliviadero on the NH side; a 2-foot-tall rubber pneumatic tablero de flash system on both the dam and spillway; the central eléctrica on the NH side contains a single double-regulated Escher Wyse turbine with an installed capacity of 5 MW; a bypassed reach on the west bank at the old mill where water was formerly provided to and discharged from the mill. All entrances have been sealed and no water passes through that reach.
El proyecto opera en un de pasada mode and impounds a 290-acre reservoir. Depósito level is maintained at the top of the tableros de flash through operation of a pond level control system. The project provides a minimum flow of 1,108 cfs or inflow, if less. Project inflow is controlled by the flow discharged from the upstream McIndoes Hydroelectric Station. This flow regime is based on the USFWS summertime New England Aquatic Base Flow methodology and run-of-river operations have been confirmed by the Vermont Department of Environmental Conservation.
Waters within the project reach are designated Class B by both Vermont and New Hampshire. These waters are managed for high quality aquatic habitat and primary/recreación de contacto secundario. Monitoring was conducted in 2014 to assess dissolved oxygen, water temperature, total phosphorus, and chlorophyll-a. New Hampshire Department of Environmental Services confirmed that based on the data collected the project does not adversely impact water quality in the river.
Historically, the Connecticut River supported many migratory fish species including Atlantic salmon. Dams constructed downstream of the project create barriers to passage. The long-running Connecticut River Atlantic salmon stocking restoration program was terminated in 2012 and upstream passage at the project is not needed. Downstream passage was facilitated by a steel collection box with a slide gate that allowed water to flow through a passage pipe that discharged into the tailrace. The passage facility was installed in accordance with agency prescriptions. Due to the cessation of the salmon restoration program, this passage facility is no longer operated unless requested by resource agencies. Resident fish species at the project include banded killifish, bluegill, white sucker, fallfish, longnose dace, smallmouth bass, tessellated darter, and yellow perch. Trashracks with 1-inch spacing (top 10 feet of the rack) and 3-inch spacing (lower 30 inches of the rack) effectively exclude most fish from arrastre.
The project lands consist of nine acres. Land use around the project is primarily undeveloped woodlands and cleared farmlands, with limited development along the shoreline until the town of Bath and small areas of development in East Ryegate. Run-of-river operations help maintain aquatic and fisheries habitat.
Threatened or endangered species potentially present in the project vicinity include the Balsam groundsel, Northern long eared bat, and Dwarf wedgemussel. There is no critical habitat for the Northern long-eared bat and the project operates in compliance with the USFWS Section 4(d) Rule which includes restrictions on tree clearing during roost season for the bats (June1-July 31). The Dwarf wedgemussel has not been located in the project vicinity. The run-of-river operation of the project mitigates any impact on the balsam groundsel and the project must consult with the New Hampshire Natural Heritage Bureau before conducting any ground-disturbing activity.
Historic properties in the project area include the former paper mill site and associated facilities on the Vermont side of the project which are potentially eligible for listing on the Registro Nacional de Lugares Históricos. However, project operations do not impact any eligible resources as concluded by the Vermont Division for Historic Preservation.
Recreational resources at the project include fishing access, a canoe portage, and a camping shelter for paddlers, all located on the NH side of the river. Public access is provided free of charge.
Estado de cumplimiento
El Certificado incluye las siguientes condiciones específicas de la instalación:
Condición 1: Prior to undertaking any ground-disturbing activity in the region below the dam, the Owner shall consult with NH Natural Heritage Bureau and if needed, conduct a survey for balsam groundsel and develop any necessary mitigation measures. Prior to felling any trees, the Owner shall consult with US Fish and Wildlife Service to review and ensure compliance with the Best Management Practices for Hazard Tree Removal contained in the report “Beneficial Forest Management Practices for WNS-affected Bats” (refer to the review report for link to the report).
2024: No material changes or compliance issues were identified. The project remains in compliance based on the annual review. For Condition 1, the project reported no activities requiring consultation.
2023: No material changes or compliance issues were identified. The project remains in compliance based on the annual review. For Condition 1, the project reported no activities requiring consultation. The project reported a planned impoundment drawdown and mussel survey were conducted. No dwarf wedgemussels or other listed mussel species were found.
2022: No material changes or compliance issues were identified. The project remains in compliance based on the annual review. For Condition 1, the project reported no activities requiring consultation. The project has been out of service since August 2021 for a unit overhaul. Operation is expected to resume in June 2022.
2021: There were no reported changes or compliance issues. The project remains in compliance based on the annual review. For Condition 1, the project reported no activities requiring consultation.
2020: There were no reported changes or compliance issues. The project remains in compliance based on the annual review. For Condition 1, the project confirmed consultation with USFWS prior to tree cutting.
2019: La presentación de informes anuales para el Certificado actual aún no ha entrado en vigor.
Historial de certificaciones
1 de enero de 2022: El plazo del Certificado LIHI se ha extendido de acuerdo con la Revisión 2.05 del Manual de Certificación LIHI 2.ª Edición emitido el 1 de enero de 2022. Consulte la tabla de instalaciones anterior para conocer el nuevo plazo.
February 7, 2020: The decision to recertify the Dodge Falls Project became final after the close of the appeals period on February 6, 2020 with no appeals filed. The Certification term is from June 1, 2019 – May 31, 2024.
7 de enero de 2020: The Low Impact Hydropower Institute has preliminarily approved Low Impact Recertification for the Dodge Falls Hydroelectric Project, LIHI #42. This decision is preliminary pending the 30-day appeal window. Only those who commented on the initial application during the 60-day comment period are eligible to file an appeal. Such appeal needs to include an explanation as to how the Project does not meet the LIHI criteria. Appeal requests can be submitted by email to comentarios@lowimpacthydro.org with “Dodge Falls Hydroelectric Project” in the subject line, or by mail addressed to the Low Impact Hydropower Institute, 329 Massachusetts Ave, Suite 6, Lexington, MA 02420. All requests will be posted to the website. The applicant will have an opportunity to respond and any response will also be posted. Las solicitudes deben recibirse antes de las 5 p. m., hora del Este, el 6 de febrero de 2020. The full application and reviewers report are available below. If no appeal requests are received and the decision becomes final, the Certification term for the Project will be from June 1, 2019 to May 31, 2024.
October 14, 2019: The Low Impact Hydropower Institute has received a complete application for Low Impact Recertification of the Dodge Falls Hydroelectric Project. LIHI is seeking public comment on this application. Specifically, we are interested in knowing whether you think the Project meets the LIHI Low Impact Certification Criteria, as revised in the 2nd Edition Handbook. Please review the program and criteria in LIHI’s revised Manual y luego revise los materiales de solicitud del Proyecto a continuación. Comentarios que están directamente relacionados con criterios específicos de LIHI (caudales, calidad del agua, paso de peces, etc.) serán de gran ayuda, pero se tendrán en cuenta todos los comentarios. Los comentarios pueden enviarse al Instituto por correo electrónico a comentarios@lowimpacthydro.org with “Dodge Falls Project Comments” in the subject line, or by mail addressed to the Low Impact Hydropower Institute, 329 Massachusetts Avenue, Suite 6, Lexington, MA 02420. Comments must be received on or before 5 pm Eastern time on December 13, 2019 Se considerarán todos los comentarios. Se publicarán en el sitio web y el solicitante tendrá la oportunidad de responder. También se publicarán todas las respuestas.
June 3, 2015: Executive Director Michael J. Sale, using authority delegated from the LIHI Governing Board, has determined that the Dodge Falls Hydroelectric Project (FERC No. 8011) satisfies the LIHI Certification Criteria. The effective certification date for the Dodge Falls Project is June 1, 2014 for a five (5) year term, which will expire on June 1, 2019, with the following condition:
- Condición satisfecha 2017. Condición 1: The facility owner shall consult with the NHDES to develop a water quality monitoring plan to define current water quality conditions at the Dodge Falls dam and powerhouse, shall implement that plan, and shall report the results to NH DES and to LIHI within six months of the date of recertification. If the facility is found to be the cause of any violations of state water quality standards, the facility owner shall notify LIHI within 30 days of such a finding and shall develop a remediation plan to correct the violations. LIHI reserves the right to suspend or rescind its certification if successful remediation is not implemented.
September 5, 2014: The Low Impact Hydropower Institute (LIHI) received an application for a second term of Low Impact Certification of the Dodge Falls Hydroelectric Project, FERC #8011, located on the Connecticut River in Vermont. The current Certificate term expired June 1, 2014, but an extension of the term has been granted through December 31, 2014 to allow for administrative processing and public comment. The 2014 Dodge Falls application materials are available below.
August 29, 2009: The Dodge Falls Project has been certified as low impact for a five year term, effective June 1, 2009 and expiring June 1, 2014.
June 1, 2009: Dodge Falls Associates, LP has submitted an application for certification of the Dodge Falls Hydroelectric Project. A public comment period for the application will remain open for 60 days.
Archivos de certificación
Recertificación 2019
- Dodge Falls Recertification Review Report 2019