Certificado LIHI #174 - Proyecto Cross Power, Nuevo Hampshire



| Nombre del proyecto | Poder cruzado |
| Certificado LIHI No. | 174 |
| Plazo del certificado LIHI | August 31, 2026 – August 30, 2036 |
| Dueño | Great Lakes Hydro America, LLC, una subsidiaria de Brookfield Renewable Energy Group |
| Estado | Nuevo Hampshire |
| Ubicación | Milla fluvial 136,9 – Río Androscoggin |
| Capacidad instalada | 3,445 MW |
| Generación media anual | 12,674 MWh |
| Tipo de instalación | Flujo de río |
| Comisión Federal de Comercio No. | P-2326, issued in 2025, expires 08/31/2065 |
El Proyecto Cross Power se ubica en el río Androscoggin, en el condado de Coos, al norte de Nuevo Hampshire. El río Androscoggin atraviesa los estados de Nuevo Hampshire y Maine. Se une al río Kennebec en la bahía Merrymeeting, en Maine, antes de desembocar en el golfo de Maine y posteriormente en el océano Atlántico. La cuenca del río Androscoggin alberga 19 proyectos hidroeléctricos ubicados a lo largo de sus 286 kilómetros de longitud.
El proyecto es uno de varios proyectos hidroeléctricos dentro de un alcance de 11 millas del río Androscoggin entre Berlín y Shelburne, New Hampshire, incluido el tramo aguas arriba. Proyecto Aserradero (LIHI #173) y proyectos posteriores: Cascada (LIHI #188), Alto Gorham (LIHI #175), Gorham (LIHI #153), y Shelburne (LIHI #176).
El poder de la cruz presa Fue construida originalmente en 1903. Tiene 448 pies de largo con una altura máxima de 20 pies y está compuesta por:
- Secciones de hormigón sin desbordamiento adosadas a un afloramiento de cornisa. Una sección contiene una abertura para troncos de retención que se utiliza para el paso de los escombros acumulados. La otra sección se ubica desde el afloramiento hasta el... aliviadero.
- Una sección de aliviadero de 276 pies de largo con un nuevo diseño de 42 pulgadas de alto tableros de flash Instalado en el otoño de 2020.
- Una caseta de entrada de 5,8 metros de ancho por 37,5 metros de largo con cinco puestos. Cada puesto contiene cestos para basura de 6,6 metros de ancho por 5,7 metros de alto, con un espacio libre de 7,6 cm.
- Un muro de contención de hormigón que se extiende desde la puerta de entrada hasta el terraplén del río.
El central eléctrica Se encuentra a 44 pies aguas abajo de la caseta de control. La central eléctrica es una subestructura de hormigón con una superestructura de ladrillo y una ampliación en la orilla aguas abajo que contiene cinco turbinas de hélice horizontales con una capacidad instalada total de 3,445 MW.
El proyecto opera en cuasi-de pasada El sistema embalsa un embalse de 22 acres. El embalse puede fluctuar en un rango de 6 pulgadas. Dado que el tramo de derivación es muy corto, la central eléctrica es esencial para la presa, y debido al remanso del Proyecto Cascade aguas abajo, no se especifica una liberación mínima de caudal. El régimen de caudal se desarrolló en consulta con el Servicio de Pesca y Vida Silvestre de los Estados Unidos (USFWS) y el Departamento de Servicios Ambientales de New Hampshire.
Las aguas dentro del alcance del proyecto se clasifican como de Clase B, aptas para la pesca, la recreación de contacto primario y el suministro de agua después del tratamiento. Las aguas del proyecto están catalogadas como contaminadas debido a vertidos previos de varias fábricas de papel. Dadas las operaciones de pasada, es improbable que el proyecto afecte negativamente la calidad del agua.
El río Androscoggin no es accesible para diádromo fish species in the project reach due to downstream natural falls – Lewiston and Rumford Falls. American eel are present in the lower reaches of the Androscoggin River though none have historically reached the upper sections of the river. The project area supports cold-water fishery habitat. New Hampshire Department of Fish and Game annually stocks brook, rainbow, and brown trout upstream of the project. Resident river species include fallfish, smallmouth bass, white sucker, longnose dace, common shiner, spottail shiner, and yellow perch. Downstream passage can occur by means of spillway flow, low-level gate releases, and power intake flow through the trashracks. The project does not impede the successful completion of resident fish life cycles.
Los terrenos del proyecto se limitan al área ocupada por la infraestructura. Las operaciones de pasada del proyecto y la limitada fluctuación del embalse protegen las zonas costeras.
Threatened or endangered species potentially present in the project vicinity include the Northern long-eared bat, Canada lynx, the proposed for listing tri-colored bat and monarch butterfly. The project avoids removing trees from April 15 through October 31, unless emergency tree removal for public safety is necessary.
The project’s dam, powerhouse, gatehouse, and gatehouse machinery are eligible for listing on the Registro Nacional de Lugares Históricos (NRHP). No Native American lands, known as traditional cultural properties, or NRHP-eligible tribal resources are present within the Project boundary. The project operates under a Programmatic Agreement (PA) in consultation with the State Historic Preservation Office. The PA and related Historic Properties Management Plan (HPMP) provides provisions detailing annual monitoring and reporting concerning repair and improvement activities conducted as well as any scheduled activities for the upcoming year.
Recreational resources at the project include a tailrace fishing area and non-project Glenside Park. The project is required to develop a Recreation Management Plan (RMP) within one year of license issuance to address the identified lack of impoundment access and to formalize recreational features. Public access is provided free of charge.
Estado de cumplimiento
El Certificado incluye las siguientes condiciones específicas de la instalación:
Condición 1: The Facility Owner shall submit the final Operational Compliance Monitoring Plan (OCMP) to LIHI once it has been approved by resource agencies and FERC. In annual compliance submittals to LIHI the Facility Owner shall submit a summary of all planned and unplanned operational deviations that occurred during the year along with evidence of resource agency consultation and comments received.
Condición 2: The Facility Owner shall submit the final Historic Properties Management Plan (HPMP) to LIHI once it has been approved by the SHPO and FERC. In annual compliance submittals to LIHI, the Facility Owner shall report on any consultation that occurred during the year related to ground-disturbing or other activities subject to the HPMP.
Condición 3: The Facility Owner shall submit the Recreation Management Plan (RMP) to LIHI once it has been approved by resource agencies and FERC. In annual compliance submittals to LIHI, the Facility Owner shall report on any required maintenance, development of sites or other activities subject to the RMP.
2026: La presentación de informes anuales para el Certificado actual aún no ha entrado en vigor.
Historial de certificaciones
18 de agosto de 2026: The Low Impact Hydropower Institute has preliminarily approved Low Impact recertification for the Cross Power Hydroelectric Project. The mid-term review applications and reviewer report are available below. The certification includes three conditions included in the review report to ensure that FERC relicensing implementation measures are timely met. The decision is preliminary pending the 30-day appeal window. Only those who commented on the initial application during the 60-day comment period are eligible to file an appeal. Such appeal needs to include an explanation as to how the Project does not meet the LIHI criteria. Appeal requests can be submitted by email to comments@lowimpacthydro.org Envíe su solicitud con el asunto “Proyecto Cross Power” o por correo postal a Low Impact Hydropower Institute, 68 Harrison Ave Ste 605, PMB 113938 Boston, Massachusetts 02111-1929. Todas las solicitudes se publicarán en el sitio web. El solicitante tendrá la oportunidad de responder, y cualquier respuesta también se publicará. Las solicitudes deben recibirse antes de las 5 de la tarde, hora del este, del 17 de septiembre de 2026. Si no se reciben solicitudes de apelación, el nuevo período de certificación será del 31 de agosto de 2026 al 30 de agosto de 2036.
28 de abril de 2026: El Instituto de Energía Hidroeléctrica de Bajo Impacto (LIHI) ha recibido una solicitud completa (véase más abajo) para una revisión intermedia del Proyecto Cross Power. Este proyecto es uno de varios proyectos certificados por el LIHI ubicados en la parte alta del río Androscoggin en New Hampshire, a los que la FERC otorgó nuevas licencias en septiembre de 2025. De acuerdo con la Sección 5.3.4 de la 2.ª edición del Manual del LIHI, la emisión de una nueva licencia constituye un “cambio sustancial” y da lugar a una revisión intermedia de la certificación del LIHI.
LIHI solicita comentarios del público sobre esta solicitud. Específicamente, nos interesa saber si usted cree que el Proyecto continúa cumpliendo con los Criterios de Certificación de Bajo Impacto de LIHI, tal como se revisaron en el Manual de la 2.ª edición. Los comentarios que estén directamente vinculados a criterios específicos de LIHI (caudales, calidad del agua, paso de peces, etc.) serán de gran ayuda, pero se tendrán en cuenta todos los comentarios. Los comentarios pueden enviarse a LIHI por correo electrónico a comments@lowimpacthydro.org con “Comentarios sobre energía cruzada” en el asunto, o por correo postal dirigido al Low Impact Hydropower Institute, 68 Harrison Ave. Ste 605, PMB 113938, Boston MA 02111-1929. Los comentarios deben recibirse antes de las 5 de la tarde, hora del este, del 27 de junio de 2026 para ser tenidos en cuenta. Todos los comentarios se publicarán en el sitio web y los solicitantes tendrán la oportunidad de responder. Cualquier respuesta también se publicará.
1 de enero de 2022: El plazo del Certificado LIHI se ha extendido de acuerdo con la Revisión 2.05 del Manual de Certificación LIHI 2.ª Edición emitido el 1 de enero de 2022. Consulte la tabla de instalaciones anterior para conocer el nuevo plazo.
30 de noviembre de 2020: La decisión de certificar el Proyecto Cross Power quedó firme tras el cierre del plazo de apelaciones el 27 de noviembre de 2020, sin que se presentaran apelaciones. El plazo de certificación es del 31 de agosto de 2020 al 30 de agosto de 2025.
27 de octubre de 2020:El Instituto de Energía Hidroeléctrica de Bajo Impacto (LIHI) aprobó preliminarmente la Certificación de Bajo Impacto para los Proyectos Hidroeléctricos Sawmill, Cross Power, Upper Gorham y Shelburne, ubicados en el río Androscoggin, New Hampshire. Esta decisión es preliminar, a la espera del plazo de apelación de 30 días. Solo quienes comentaron sobre la solicitud inicial durante el plazo de 60 días pueden presentar una apelación. Dicha apelación debe incluir una explicación de por qué el Proyecto no cumple con los criterios del LIHI. Las solicitudes de apelación para uno o más de estos proyectos pueden enviarse por correo electrónico a comments@lowimpacthydro.org Con el asunto "Proyectos del río Androscoggin-NH", o por correo postal dirigido al Instituto de Energía Hidroeléctrica de Bajo Impacto, 329 Massachusetts Ave, Suite 6, Lexington, MA 02420. Todas las solicitudes se publicarán en el sitio web. El solicitante tendrá la oportunidad de responder, y cualquier respuesta también se publicará. Las solicitudes deben recibirse antes de las 5 p. m., hora del Este, del 27 de noviembre de 2020.La solicitud completa y el informe de revisión están disponibles a continuación. Si no se reciben solicitudes de apelación, el período de certificación para cada proyecto será del 31 de agosto de 2020 al 30 de agosto de 2025.
13 de agosto de 2020: El Instituto de Energía Hidroeléctrica de Bajo Impacto (LIHI) ha recibido una solicitud completa para la Certificación de Bajo Impacto de los proyectos hidroeléctricos Sawmill, Cross Power, Upper Gorham y Shelburne, ubicados en el río Androscoggin en New Hampshire. LIHI solicita comentarios del público sobre esta solicitud. Específicamente, nos interesa saber si usted considera que los proyectos cumplen con los Criterios de Certificación de Bajo Impacto de LIHI, según la revisión de la 2.ª edición del Manual. La solicitud se encuentra disponible a continuación. Los comentarios directamente relacionados con criterios específicos de LIHI (caudales, calidad del agua, paso de peces, etc.) serán de gran utilidad, pero se considerarán todos los comentarios. Los comentarios pueden enviarse al Instituto por correo electrónico a comments@lowimpacthydro.org con “Comentarios sobre el Proyecto Androscoggin River-NH” en la línea de asunto, o por correo dirigido al Low Impact Hydropower Institute, 329 Massachusetts Avenue, Suite 6, Lexington, MA 02420. Los comentarios deben recibirse antes de las 5 p. m., hora del Este, el 12 de octubre de 2020 para ser considerados. Todos los comentarios se publicarán en el sitio web y el solicitante tendrá la oportunidad de responder. Las respuestas también se publicarán.
Archivos de certificación
Revisión de mitad de período de 2026
- Informe de revisión de mitad de período de Cross Power
- Solicitud de revisión intermedia del río Androscoggin
Certificación 2020
- Revisión de la certificación de proyectos de NH en Berlín 2020
- Solicitud de certificación de proyectos de Berlín NH 2020