LIHI Certificate #174 - Cross Power Project, New Hampshire

項目名稱 Cross Power
理海證書編號 174
LIHI 證書期限 2020 年 8 月 31 日 – 2030 年 8 月 30 日
擁有者 Great Lakes Hydro America, LLC,布魯克菲爾德再生能源集團的子公司
狀態 新罕布夏州
地點 River Mile 136.9 – Androscoggin River
裝置容量 3.22 MW
平均年發電量 15,025 MWh
設施類型 河流的奔流
聯邦能源監管委員會 不。 Cross Power P-2326

1994 年發行,有效期限至 2024 年 7 月 31 日

The Cross Power Project is located on the Androscoggin River in Coos County, northern New Hampshire. The Androscoggin River is runs through the states of New Hampshire and Maine. The river joins the Kennebec River at Merrymeeting Bay in Maine before emptying into the Gulf of Maine and subsequently the Atlantic Ocean. The Androscoggin River watershed contains 19 hydroelectric projects located along the 178-mile-long river.

The Project is one of several hydroelectric projects within an 11-mile reach of the Androscoggin River between Berlin and Shelburne, New Hampshire, including the upstream Sawmill Project (LIHI #173) and downstream projects: Cascade (LIHI #188), 上戈勒姆 (LIHI #175), 戈勒姆 (LIHI #153), 和 謝爾本 (LIHI #176).

The Cross Power was originally constructed in 1903.  It is 566 feet long with a maximum height of 20 feet and is comprised of:

  • Concrete non-overflow sections adjoined to a ledge outcropping. One section contains a stop-log opening used to pass accumulated debris. The other section is located from the outcropping to the 溢洪道.
  • A 276-foot-long spillway section with newly designed 42-inch-high 閃光板 installed in the fall of 2020.
  • A gatehouse 19 feet wide by 124 feet long with five bays. Each bay contains trashracks 21.6 feet wide by 18.4 feet-high with 3-inch clear spacing.
  • A concrete retaining wall extending from the gatehouse to the river embankment.

發電站 is located 44 feet downstream of the gatehouse. The powerhouse is a concrete substructure with brick superstructure with an addition on the downstream shore side containing five horizontal propeller turbines with a total installed capacity of 3.22 MW.

The project operates in quasi-徑流 mode and impounds a 22-acre reservoir. The impoundment is allowed to fluctuate over a 6-inch range. Since the bypass reach is very short, the powerhouse is essentially integral to the dam, and due to backwatering from the downstream Cascade Project, no minimum flow release is specified. The flow regime was developed in consultation with US Fish and Wildlife Service (USFWS) and the New Hampshire Department of Environmental Services.

Waters within the project reach are designated Class B, suitable for fishing, primary contact recreation, and water supply after treatment. The project waters are listed as impaired for prior discharges from several paper mills. Given run-of-river operations, the project is unlikely to adversely impact water quality.

安德羅斯科金河無法到達 洄游性 fish species in the project reach. Species such as alewife, blueback herring, striped bass, sea lamprey, and American shad are not present in the area due to downstream natural falls – Lewiston and Rumford Falls. American eel are present in the lower reaches of the Androscoggin River though none have historically reached the upper sections of the river. The project area supports cold-water fishery habitat. New Hampshire Department of Fish and Game annually stocks brook, rainbow, and brown trout upstream of the project. Resident river species include fallfish, smallmouth bass, white sucker, longnose dace, common shiner, spottail shiner, and yellow perch. Downstream passage can occur by means of spillway flow, low-level gate releases, and power intake flow through the trashracks. The project does not impede the successful completion of resident fish life cycles.

The project lands are limited to the area occupied by project infrastructure. The project’s run-of-river operations and limited impoundment fluctuation provides protection for shoreline areas.

Threatened or endangered species potentially present in the project vicinity include the Northern long-eared bat, Canada lynx, Eastern small-footed bat, little brown bat, tri-colored bat, bald eagle, Cape May warbler, evening grosbeak, rusty blackbird, wood thrush, wood turtle, American marten, peregrine falcon, and common nighthawk. Plant species include auricled twayblade, mountain sweet-cicely, ovoid spikesedge, parasol sedge, pink shinleaf, purple virgin’s-bower, round-leaved orchid, smooth cliff fern, dwarf blueberry, fragrant wood fern, heart-leaved twayblade, and Hornemann’s willow-herb.

由於通常沒有清理樹木活動或走廊維護活動,因此列出的蝙蝠物種不太可能受到專案運作的影響。為了確保水壩安全,我們會移除一些植被並進行維護,但上述活動符合美國魚類和野生動物管理局關於蝙蝠棲息地保護的 4(d) 規定。大多數其他列出的物種都已在計畫附近被發現,但徑流作業和蓄水波動限制減輕了對這些物種的影響。

項目區域不存在任何已知的歷史或文化資源。不過,該計畫是在與國家歷史保護辦公室協商後,按照計畫協議 (PA) 運作的。 PA 提供了詳細說明已進行的修復和改進活動以及來年任何計劃的活動的年度監測和報告的規定。

Recreational resources at the project include a tailrace fishing area. Public access is provided free of charge.


合規狀態

此證書包括以下設施特定條件:

條件一: 設施所有者應向 LIHI 提供專案重新許可的持續狀態更新,包括研究、FERC 備案、資源機構諮詢、規定和建議以及機構對研究結果的評論。 LIHI 保留根據重新授權的結果修改憑證或條件的權利。

2024: No material changes or compliance issues were identified. The project remains in compliance based on the annual review. For Condition 1, the project provided a status update and links to relicensing documents.  FERC issued its draft Environmental Assessment on May 23, 2024.  The project reported two headpond deviations, not FERC violations.

2023: 未發現任何重大變更或合規問題。根據年度審查結果,該項目仍然合規。對於條件 1,該項目報告的狀態沒有變化。

2022: No material changes or compliance issues were identified. The project remains in compliance based on the annual review. For Condition 1, the project reported filing the final FERC relicensing application on August 29, 2022.

2021:  There were no reported changes. The project reported a brief flow deviation due to a station trip which did not constitute a FERC violation. The project remains in compliance based on the annual review. For Condition 1, the project reported filing of the relicensing initial study report.

2020: 目前證書的年度報告尚未生效。


認證歷史

2022 年 1 月 1 日: 根據 2022 年 1 月 1 日發布的 LIHI 第二版認證手冊第 2.05 版,LIHI 證書期限已延長。

2020年11月30日: The decision to certify the Cross Power Project became final after the close of the appeals period on November 27, 2020 with no appeals filed. The Certification term is from August 31, 2020 – August 30, 2025.

2020 年 10 月 27 日:低影響水力發電研究所 (LIHI) 初步批准對位於新罕布夏州安德羅斯科金河的 Sawmill、Cross Power、Upper Gorham 和 Shelburne 水力發電計畫進行低影響認證。該決定是初步決定,需等待 30 天的上訴期。只有在 60 天的評論期內對初始申請發表評論的人才有資格提出上訴。此類上訴需要包括有關該項目為何不符合 LIHI 標準的解釋。針對其中一個或多個項目的申訴請求可以透過電子郵件提交至 評論@lowimpactHydro.org 主題行為“安德羅斯科金河-新罕布什爾州計畫”,或郵寄至低影響水力發電研究所,地址為:329 Massachusetts Ave, Suite 6, Lexington, MA 02420。所有請求都將發佈到網站上。申請人將有機會回應,任何回應也將公佈。 請求必須在東部時間 2020 年 11 月 27 日下午 5 點前收到。完整的申請和審查報告如下。如果沒有收到上訴請求,每個項目的認證期限將為2020年8月31日至2025年8月30日。

2020 年 8 月 13 日: 低影響水力發電研究所已收到位於新罕布夏州安德羅斯科金河的 Sawmill、Cross Power、Upper Gorham 和 Shelburne 水力發電計畫的低影響認證完整申請。 LIHI 正在就該申請徵求公眾意見。具體來說,我們想知道您是否認為這些項目符合第二版手冊中修訂的 LIHI 低影響認證標準。該應用程式可以在下面找到。與特定 LIHI 標準(流量、水質、 魚道等等)將非常有幫助,但所有評論都會被考慮。意見可以透過電子郵件提交給研究所 評論@lowimpactHydro.org 主旨欄請註明“安德羅斯科金河-新罕布夏州計畫評論”,或郵寄至低影響水力發電研究所,地址:329 Massachusetts Avenue, Suite 6, Lexington, MA 02420。 評論必須在 2020 年 10 月 12 日東部時間下午 5 點或之前收到,才會被考慮。 所有評論都將發佈到網站上,申請人將有機會回應。任何回覆也會公佈。


認證文件

2020 認證


關鍵文件