斯图尔特大桥项目 – 已收到完整申请
Lexington MA (June 26, 2020): The Low Impact Hydropower Institute has received a complete application for Low Impact Certification of the Stewart’s Bridge Hydroelectric Project. LIHI is seeking public comment on this application. Specifically, we are interested in knowing whether you think the Project meets the LIHI Low Impact Certification Criteria, as revised in the 2nd Edition Handbook. The Project’s application materials can be found 这里。
与特定 LIHI 标准(流量、水质、鱼类通道等)直接相关的评论将非常有帮助,但所有评论都会被考虑。评论可以通过电子邮件提交给研究所,地址为 comments@lowimpacthydro.org 主题行为“斯图尔特大桥项目评论”,或邮寄至低影响水电研究所,地址:329 Massachusetts Avenue, Suite 6, Lexington, MA 02420。 评论必须在 2020 年 8 月 25 日东部时间下午 5 点或之前收到 予以考虑。所有评论都将发布到网站上,申请人将有机会作出回应。任何回应也将发布。