
初步决定 - 重新认证 Cosgrove 项目,LIHI #55,MA
2023年11月17日
初步决定——重新认证马萨诸塞州红桥、普茨桥、印第安果园和德怀特项目
2023年11月28日November 20, 2023: The Low Impact Hydropower Institute (LIHI) has received a complete recertification application from Massachusetts Water Resource Authority for the Oakdale Project located in the Quabbin Aqueduct, in West Boylston Massachusetts. LIHI is seeking comment on this application. Comments that are directly tied to specific LIHI criteria (flows, water quality, 鱼道等)将非常有帮助,但所有评论都会被考虑。评论可以通过电子邮件提交给 LIHI,地址为 comments@lowimpacthydro.org with “Oakdale Project Comments” in the subject line, or by mail addressed to the Low Impact Hydropower Institute, 1167 Massachusetts Avenue, Arlington, MA 02476. Comments must be received at the Institute on or before 5 pm Eastern time on January 19, 2024 to be considered. 所有评论都将发布到网站上,申请人将有机会作出回应。所有回应也将发布。
项目描述和完整申请可以在这里找到 这里。
北安普夸项目,LIHI #69 OR – 已收到完整的重新认证申请
阅读更多