LIHI Certificate #156 – Piercefield Project, New York

项目名称 | Piercefield |
LIHI 证书编号 |
156 |
LIHI Certification Term |
April 26, 2019 – April 25, 2029 |
所有者 | 伊利大道水电有限公司 (Erie Boulevard Hydropower, LP),布鲁克菲尔德可再生能源集团 (Brookfield Renewable Energy Group) 的子公司 |
状态 | 纽约 |
地点 | River Mile 88.5 on the Raquette River |
装机容量 | 2.7 MW |
平均年发电量 | 16,520 MWh |
设施类型 | 修改的 run of river |
联邦能源管理委员会 不。 | P-7387 issued 2005, expires 10/31/2035 |
The Piercefield Project is located on the Raquette River near the Town of Piercefield in Franklin and St. Lawrence Counties in New York. The project 坝 和 发电站 were originally constructed in 1899 by the International Paper Company to provide mechanical power to the paper making process. The facility was converted to an electric generating station in 1926. Several other modifications took place in the early 1900s and later in the 1970s to replace timber sections of the structures with stronger concrete structures.
The Raquette River has a total drainage basin of 1,269 square miles at its mouth and originates in the Adirondack highlands at Blue Mountain Lake, Raquette Lake and Long Lake. The river flows generally north-northwest for more than 146 miles, through Potsdam, New York, and empties into the St. Lawrence River, near Massena, New York.
A total of 19 hydroelectric projects exist on the Raquette River, most of which are owned by the project owner including from upstream to downstream, Yaleville (LIHI #157), Upper Raquette (LIHI #14A), Middle Raquette (LIHI #14B), 和 Lower Raquette (LIHI #14C). The project itself is the southernmost and furthest upstream dam on the river.
The project includes: the dam, retaining wall, stop-log 泄洪道, 弧形 spillway, bypassed reach, powerhouse, one vertical 弗朗西斯式水轮机, and two horizontal double Francis turbines./p>
The dam is a 23-foot-high concrete and timber dam, approximately 300 feet long with a 495-foot-long retaining wall/dike on the right shoreline. A 700-foot-long retaining wall is located along the left shoreline. The 泄洪道 include a 118-foot-long stanchion type stop log spillway and a 294-foot-long, 23-foot-high ogee spillway section with an Obermeyer inflatable 2-foot-high flashboard system, and a 110-foot-long forebay retaining wall. A 550-foot-long bypassed reach is created by the dam. The powerhouse contains one vertical Francis unit and two horizontal double Francis units with a combined capacity of 2.7 MW.
The project operates in a modified 径流 mode and impounds a 370-acre reservoir that extends 1.9 miles upstream. The project provides a minimum flow of 150 cfs in the tailrace and impoundment fluctuations are maintained within 1-foot from the top of the 闪光板. This flow regime was developed in collaboration with the New York State Department of Environmental Conservation (NYSDEC), US Fish and Wildlife Service (USFWS), the Adirondack Park Agency, and New York Rivers United. The parties involved concur that this flow regime provides adequate habitat downstream and maintains a stable vegetative buffer around the reservoir. An additional 20 cfs is provided farther down in the bypassed reach to provide attraction flows away from intakes to minimize fish 夹带 and to provide downstream passage.
Waters within the project reach are designated as Class C. There are no impaired waters in the project vicinity and NYSDEC has confirmed that the project continues to meet every designated use group.
Downstream waterfalls and water features create natural barriers to passage for migratory fish species at the project. The project reach supports resident fish populations of yellow perch, walleye, rock bass, smallmouth bass, lake whitefish, fallfish, and golden shiner. Walleye are particularly abundant in the project area. The 150-cfs minimum flow requirement supports fishery resources downstream of the project and the 20-cfs downstream fish bypass provides adequate passage and trashracks with 1-inch spacing mitigate potential for entrainment. This design was approved by NYSDEC and USFWS for downstream passage protection.
The project lands consist of roughly 18 acres located in the Adirondack State Park, and is governed by Part 577 of the Wild, Scenic, and Recreational Rivers Act which restricts new structure development, promotes forest management, and requires a buffer zone from the river’s edges. The project operates under a flow and water level monitoring plan which minimizes effects to the shoreline via limiting impoundment fluctuations. This ensures an adequate vegetative buffer on the shoreline and minimizes erosion.
Threatened or endangered species potentially present in the project vicinity include the Northern long-eared bat, bald eagle and spruce grouse. The project is in compliance with USFWS Rule 4(d) concerning the protection of Northern long-eared bat populations as well as the NYSDEC Conservation Plan for bald eagles. These provisions primarily dictate avoidance of tree clearing operations during specific nesting periods. NYSDEC also determined that the project does not have any impact on spruce grouse populations. Via consultation with NYSDEC in 2019, it was concluded that bald eagle populations are doing very well in New York and project operations do not pose any threat to their success.
Historic properties in the project area include the Piercefield dam and powerhouse, built in 1899 by the International Paper Company to produce newsprint. The project owner developed a historic properties management plan in consultation with the State Historic Preservation Office (SHPO) in order to identify historic properties, provide protective maintenance, and facilitate improvements. The project owner trained its operation staff to provide weekly monitoring updates on the historic properties and files annual reports with the SHPO.
Recreational resources at the project include a boat launch, canoe put-in/take-out areas, and two designated bank fishing areas. The project owner provides a 750-cfs recreational release for five hours on the last Saturday in June. Public access is provided free of charge.
合规状态
当前证书中没有针对设施的具体条件
2024: No material changes or compliance issues were identified. The project remains in compliance based on the annual review.
2023: No material changes or compliance issues were identified. The project remains in compliance based on the annual review.
2022: No material changes or compliance issues were identified. The project remains in compliance based on the annual review.
2021: 未报告任何变更或合规问题。根据年度审查,该项目仍然合规。
2020: 未报告任何变更或合规问题。根据年度审查,该项目仍然合规。
2019: 当前证书的年度报告尚未生效。
认证历史
2022 年 1 月 1 日: LIHI 证书期限已根据 2022 年 1 月 1 日发布的 LIHI 第 2 版认证手册 2.05 版延长。有关新期限,请参阅上面的设施表。
August 13, 2019: The decision to certify the Piercefield Hydroelectric Project is final. No appeals were received during the appeal period which closed on August 9, 2019. The new certification term for the Project is from April 26, 2019 through April 25, 2024.
July 10, 2019: The Low Impact Hydropower Institute has preliminarily approved Low Impact Certification for the Piercefield Hydroelectric Project.
此决定是初步决定,需等待 30 天的申诉期。只有在 60 天的评论期内对初始申请发表评论的人才有资格提出上诉。此类上诉需要说明该项目为何不符合 LIHI 标准。上诉请求可以通过电子邮件提交至 comments@lowimpacthydro.org with “Piercefield Hydroelectric Project” in the subject line, or by mail addressed to the Low Impact Hydropower Institute, 329 Massachusetts Ave, Suite 6, Lexington, MA 02420. All requests will be posted to the website. The applicant will have an opportunity to respond and any response will also be posted. Requests must be received by 5 pm Eastern time on August 9, 2019. 完整的申请和审阅者报告如下。
If no appeal requests are received and the decision becomes final, the Certification term for the Project (pending LIHI #156) will be April 26, 2019 for a term of five (5) years, which will expire on April 25, 2024.
May 1, 2019: The Low Impact Hydropower Institute has received a complete application for Low Impact Certification of the Piercefield Hydroelectric Project. LIHI is seeking public comment on this application. Specifically, we are interested in knowing whether you think the Project meets the LIHI Low Impact Certification Criteria, as revised in the 2nd Edition Handbook. Please review the program and criteria in LIHI’s revised 手册 然后查看下面该项目的申请材料。
与特定 LIHI 标准(流量、水质、 鱼道等)将非常有帮助,但所有评论都会被考虑。评论可以通过电子邮件提交给研究所 comments@lowimpacthydro.org with “Piercefield Project Comments” in the subject line, or by mail addressed to the Low Impact Hydropower Institute, 329 Massachusetts Avenue, Suite 6, Lexington, MA 02420. Comments must be received on or before 5 pm Eastern time on June 30, 2019 予以考虑。所有评论都将发布到网站上,申请人将有机会作出回应。任何回应也将发布。