
Jordanelle 项目,LIHI #29 – 已收到完整申请
2023年9月14日
洛林路项目,LIHI #56,马萨诸塞州 – 已收到完整申请
2023年10月24日2023 年 10 月 5 日: The Low Impact Hydropower Institute has issued a final decision on the recertification of the Bear River Hydroelectric Project located on the Bear River in Idaho. The certification term is December 31, 2022 through December 30, 2035.
北安普夸项目,LIHI #69 OR – 已收到完整的重新认证申请
阅读更多