Jordanelle Project, LIHI #29 – Complete Application Received
9 月 14, 2023洛林路项目,LIHI #56,马萨诸塞州 – 已收到完整申请
2023年10月24日2023 年 10 月 5 日: The Low Impact Hydropower Institute has issued a final decision on the recertification of the Bear River Hydroelectric Project located on the Bear River in Idaho. The certification term is December 31, 2022 through December 30, 2035.
初步决定 – 威尔斯大坝项目认证,等待 LIHI #203,WA
阅读更多