
最终决定 – 柳岛项目认证,LIHI #187
2021年12月31日
岛屿公园项目,LIHI #2 – 已收到完整申请
2022年1月4日2022 年 1 月 5 日: The Low Impact Hydropower Institute has issued a final decision on the certification of the previously certified Arrowrock Project located on the Boise River in Idaho. The 30-day appeal window closed on December 31, 2021 and no appeals were filed. Therefore, the decision to recertify the project is now final. The new term is September 20, 2021 through September 19, 2031.
初步决定——塔拉西浅滩项目重新认证,LIHI #12,GA
阅读更多