Preliminary Decision – Certification of Willow Island Project, Pending LIHI #187, OH/WV
12 月 1, 2021Preliminary Decision – Recertification of Benton Falls Project, LIHI #79, ME
12 月 14, 2021December 8, 2021: The Low Impact Hydropower Institute (LIHI) has received a complete recertification application from Fall River Rural Electric Cooperative for the Buffalo River Project located on the Buffalo River in Idaho.
LIHI 正在征求对此申请的意见。与特定 LIHI 标准(流量、水质、 鱼道等)将非常有帮助,但所有评论都会被考虑。评论可以通过电子邮件提交给 LIHI,地址为 comments@lowimpacthydro.org with “Buffalo River Project Comments” in the subject line, or by mail addressed to the Low Impact Hydropower Institute, 1167 Massachusetts Avenue, Office 407, Arlington, MA 02476. Comments must be received at the Institute on or before 5 pm Eastern time on February 6, 2022 to be considered. All comments will be posted to the web site and the applicant will have an opportunity to respond. Any response will also be posted.
项目描述和完整申请可以在这里找到 这里.
初步决定 – 威尔斯大坝项目认证,等待 LIHI #203,WA
阅读更多