Preliminary Decision – Recertification of the Cosgrove Project, LIHI #55, MA
11 月 17, 2023初步決定——馬薩諸塞州 Red Bridge、Putts Bridge、Indian Orchard 和 Dwight 計畫的重新認證
2023 年 11 月 28 日November 20, 2023: The Low Impact Hydropower Institute (LIHI) has received a complete recertification application from Massachusetts Water Resource Authority for the Oakdale Project located in the Quabbin Aqueduct, in West Boylston Massachusetts. LIHI is seeking comment on this application. Comments that are directly tied to specific LIHI criteria (flows, water quality, 魚道等等)將非常有幫助,但所有評論都會被考慮。意見可以透過電子郵件提交給 LIHI,郵箱地址為 評論@lowimpactHydro.org with “Oakdale Project Comments” in the subject line, or by mail addressed to the Low Impact Hydropower Institute, 1167 Massachusetts Avenue, Arlington, MA 02476. Comments must be received at the Institute on or before 5 pm Eastern time on January 19, 2024 to be considered. 所有評論都將發佈到網站上,申請人將有機會回應。任何回覆也會公佈。
The project description and complete application can be found 這裡。
初步決定 - 威爾斯大壩工程認證,等待 LIHI #203,華盛頓州
閱讀更多