LIHI Certificate #144 – Emeryville Project, New York

項目名稱 Emeryville
理海證書編號 144
LIHI 證書期限
July 10, 2018 – July 9, 2028
擁有者 KE Emeryville LLC
狀態 紐約
地點 River mile 70 on the Oswegatchie River
裝置容量 3.48 MW
平均年發電量 18,761 MWh
設施類型 徑流
聯邦能源監管委員會 不。 P-2850 issued in 2012, expires 05/31/2052

The Emeryville Project is located on the Oswegatchie River, in the Town of Fowler, New York. The 132 mile-long Oswegatchie river, a tributary to the St. Lawrence River, features many dams and hydroelectric facilities from its 源頭 in the northwestern Adirondacks to its confluence with the St. Lawrence – the Emeryville project is the ninth upstream located approximately two miles downstream of the Hollow (FERC #6972) and two miles upstream of the Fowler #7 Dam (FERC #6059). The Oswegatchie multi-development project (LIHI #161)Newton Falls Project (LIHI #32) are both located upstream of the project and the Hailesboro No. 6 (LIHI #199), 海爾斯伯勒 4 號 (LIHI #198)海爾斯伯勒 3 號 (LIHI #197) projects are located downstream of the Fowler #7 Dam.

The history of the site dates back to the 1800s, when the waterpower was originally used to drive pulp grinders. In 1938, Rushmore Paper Mills, Inc. demolished the pulp mill and replaced it with a hydroelectric plant. Hampshire Paper Company (HPC) purchased the site from Rushmore Paper Mills in 1953. In 1987, HPC undertook a major renovation program by removing and replacing the 發電站, turbine-generator equipment, switchyard, and portions of the intake. The project is currently owned by KE Emeryville, LLC.

The Project includes the dam, 壓力水管, intake structure, bypass reach, and powerhouse containing one turbine. The dam is an existing 16.7-foot-high, 185-foot-long, concrete-capped timber and earth fill 重力壩 with a 176-foot-long concrete 溢洪道 equipped with 2.4-foot-high 閃光板 and a 4-foot-wide, 0.5-foot-deep minimum flow weir. The intake structure consists of a 140-foot-long by 30-foot-wide reinforced concrete headgate 水槽, equipped with four 頭門 and trashracks with 5-inch clear bar spacing. The 60-foot-long, 14-foot-diameter penstock leads to the concrete powerhouse containing the horizontal axial flow turbine with an installed capacity of 3.481 MW. Flows are released to the tailrace and power generated is sent to the grid via the 80-foot-long, 23-kilovolt transmission line. The bypassed reach is 229 feet long and runs under Route 22, between Emeryville dam and downstream of the powerhouse.

該項目運營於 徑流 mode and impounds a 35-acre reservoir. The project provides minimum flows of 20 cfs into the bypassed reach year-round. A headpond sensor monitors impoundment elevation and automatically adjusts turbine discharge to maintain impoundment elevation. The flow regime was developed in consultation with New York Department of Environmental Conservation (NYSDEC) and USFWS. This regime is intended to protect aquatic species and enhance habitat.

Waters within the project reach are designated as Class A. Designated uses, as prescribed by NYSDEC, include supply for drinking, culinary or food processing purposes, primary and 二次接觸娛樂, and fishing. Water quality testing found that bioindicators including dissolved oxygen and pH levels were unchanged upstream and downstream of the project.

Migratory fish species are not present in the Oswegatchie River at the project and upstream passage is also blocked by downstream dams. A bypass flume provides passage for resident fish into a 瀑布水潭 in the bypassed reach. Trashracks with 1-inch spacing are installed seasonally (March 15 – November 30) which exclude fish passing through the turbines. The project owner improved this 魚道 by deepening and expanding the plunge pool as well as removing rocks that had the potential to damage riverine species in the bypass chute.

The project property consists of roughly 55 acres not including the impoundment. An invasive species monitoring plan has been implemented at the project to eradicate pale swallow wort populations. The project has installed informational signage, public disposal stations, and has trained staff in identification of the species as well as proper removal and disposal procedures.

Threatened and endangered species potentially within project vicinity include: Northern Long-eared bat, Indiana Bat, Lake Sturgeon, Mooneye, Eastern Sand Darter, Fernald’s Sedge. No critical habitats for either of the bat species exist in the project area. The sedge species is not impacted by project operations and the fish species have been known to occur downstream of the project but not in the project vicinity. No spawning habitat has been observed in the project area regardless of the presence of suitable habitat.

The State Historic Preservation Office and U.S. Army Corps of Engineers have noted that project operations have no impact on any registered historic properties.

Recreational resources at the project include two boat ramps that provide access to the impoundment and tailrace, a canoe portage trail, and a picnic area.


合規狀態

目前證書中沒有針對設施的具體條件

2024: 未發現重大變更或合規問題。根據年度審查,該項目仍符合規定。

2023: 未發現重大變更或合規問題。根據年度審查,該項目仍符合規定。

2022: 未發現重大變更或合規問題。根據年度審查,該項目仍符合規定。

2021: 沒有報告變更或合規問題。根據年度審查,該項目仍符合規定。

2020: 沒有報告變更或合規問題。根據年度審查,該項目仍符合規定。

2019: 沒有報告變更或合規問題。根據年度審查,該項目仍符合規定。

2018: 目前證書的年度報告尚未生效。


認證歷史

2022 年 1 月 1 日: 根據 2022 年 1 月 1 日發布的 LIHI 第二版認證手冊第 2.05 版,LIHI 證書期限已延長。

2018年10月10日: The 30-day appeal window closed for the preliminary certification decision of the Emeryville Hydroelectric Project closed on October 6, 2018 with no appeals to the decision received. The decision is therefore final, and the Emeryville Hydroelectric Project is LIHI Certificate #144. The Certificate term is July 10, 2018 through July 9, 2023.

September 4, 2018:The Low Impact Hydropower Institute (LIHI) preliminarily approved Low Impact Certification for the Emeryville Hydroelectric Project.  This decision is preliminary pending the 30-day appeal window. Only those who commented in the initial application during the 60-day comment period are eligible to file an appeal. Such appeal needs to include an explanation as to how the projects do not meet the LIHI criteria. Appeal requests can be submitted by email to 評論@lowimpactHydro.org with “Emeryville Hydroelectric Project” in the subject line, or by mail addressed to the Low Impact Hydropower Institute, 329 Massachusetts Ave, Suite 2, Lexington, MA 02420. All requests will be posted to the website and the applicant will have an opportunity to respond and any response will also be posted. 請求必須在 2018 年 10 月 6 日東部時間下午 5 點前收到。 The full application and reviewers report are available below.  If no appeal requests are received and the decision becomes final, the Certification term for the Emeryville Project will be July 10, 2018 through July 9, 2023.

February 20, 2018: The Low Impact Hydropower Institute (LIHI) has received a complete application from KEI (USA) Power Management Inc. for the Low Impact Certification of the Emeryville Hydroelectric Project (FERC No. 2850), owned by KE Emeryville LLC.  The project is located at river mile 70 on the Oswegatchie River in the town of Fowler, St. Lawrence County, New York and is the ninth hydroelectric development location upstream from the confluence with the St. Lawrence River. LIHI is seeking comment on the Emeryville application for certification. Comments that are directly tied to specific LIHI criteria (flows, water quality, fish passage, etc.) will be most helpful, but all comments will be considered.  Comments may be submitted to the Institute by e-mail at 評論@lowimpactHydro.org with “Emeryville Comments” in the subject line, or by mail addressed to the Low Impact Hydropower Institute, 329 Massachusetts Avenue, Suite 2, Lexington, MA 02420.  Comments must be received at the Institute on or before 5 pm Eastern time on April 21, 2018 予以考慮。所有評論都將發佈到網站上,申請人將有機會回應。任何回應也將被發布。


認證文件

2018 年認證


關鍵文件