7 月 5, 2022

Preliminary Decision – Certification of American Tissue Project, Pending LIHI #191, ME

July 5, 2022:  The Low Impact Hydropower Institute (LIHI) has preliminarily approved Low Impact Certification (pending LIHI #191) for the American Tissue Hydroelectric Project located on Cobbosseecontee […]
2022 年 6 月 21 日

Preliminary Decision – Recertification of Vergennes Project, LIHI #134, VT

June 21, 2022: The Low Impact Hydropower Institute (LIHI) has preliminarily approved the Vergennes Project (LIHI #134) located on Otter Creek in Vermont  for a new […]
2022 年 6 月 21 日

初步決定 – 布拉多克船閘和大壩工程認證,待 LIHI #190,PA

June 21, 2022:  The Low Impact Hydropower Institute (LIHI) has preliminarily approved Low Impact Certification (pending LIHI #190) for the Braddock Locks and Dam Hydroelectric Project located […]
2022 年 6 月 9 日

Preliminary Decision – Certification of Mattaceunk Project, Pending LIHI #189, ME

June 9, 2022: The Low Impact Hydropower Institute (LIHI) has preliminarily approved the Mattaceunk Project located on the Penobscot River in Maine for a 10-year term […]
2022 年 6 月 2 日

初步決定 - 重新認證島嶼公園項目,LIHI #2,ID

June 2, 2022: The Low Impact Hydropower Institute (LIHI) has preliminarily approved the Island Park Project located on the Henry’s Fork of the Snake River in […]
zh_TWZH