Preliminary Decision – Recertification of Pawtucket Project, LIHI #11
juin 24, 2020Stewart’s Bridge Project – Complete Application Received
juin 26, 2020October 21, 2020: The decision to certify the Stewarts Bridge Project became final after the close of the appeals period on October 17, 2020 with no appeals filed. The Certification term is from June 25, 2020 – June 24, 2025.
September 17, 2020: The Low Impact Hydropower Institute (LIHI) preliminarily approved Low Impact Certification (pending LIHI #171) for the Stewarts Bridge Hydroelectric Project located on the Sacandaga River in New York.
Cette décision est préliminaire en attendant la période d'appel de 30 jours. Seuls ceux qui ont commenté la demande initiale pendant la période de commentaires de 60 jours sont éligibles pour déposer un appel. Un tel appel doit inclure une explication sur la raison pour laquelle le projet ne répond pas aux critères du LIHI. Les demandes d'appel peuvent être soumises par courrier électronique à commentaires@lowimpacthydro.org with “Stewarts Bridge Project” in the subject line, or by mail addressed to the Low Impact Hydropower Institute, 329 Massachusetts Ave, Suite 6, Lexington, MA 02420. All requests will be posted to the website. The applicant will have an opportunity to respond and any response will also be posted. Requests must be received by 5 pm Eastern time on October 17, 2020.
The full application and reviewer’s report are available below. If no appeal requests are received the certification term will be June 25, 2020 through June 24, 2025.
June 26, 2020: The Low Impact Hydropower Institute has received a complete application for Low Impact Certification of the Stewart’s Bridge Hydroelectric Project. LIHI is seeking public comment on this application. Specifically, we are interested in knowing whether you think the Project meets the LIHI Low Impact Certification Criteria, as revised in the 2nd Edition Handbook. Please review the program and criteria in LIHI’s revised Manuel et consultez ensuite les documents de candidature du projet ci-dessous.
Comments that are directly tied to specific LIHI criteria (flows, water quality, passage des poissons, etc.) will be most helpful, but all comments will be considered. Comments may be submitted to the Institute by e-mail at commentaires@lowimpacthydro.org with “Stewart’s Bridge Project Comments” in the subject line, or by mail addressed to the Low Impact Hydropower Institute, 329 Massachusetts Avenue, Suite 6, Lexington, MA 02420. Comments must be received on or before 5 pm Eastern time on August 25, 2020 to be considered. All comments will be posted to the web site and the applicant will have an opportunity to respond. Any response will also be posted.
Project Description:
The Stewart’s Bridge Project (Fédération internationale de radio-télévision (FERC) No. 2047) is located at river mile 3 on the Sacandaga River in the town of Hadley, Saratoga County, New York. The Sacandaga River is a tributary to the Hudson River. Great Sacandaga Lake (FERC No. 12252) controls 1,044 square miles of the drainage area that contributes to the hydroelectric projects on the Hudson River. Discharges from the reservoir are regulated by the Hudson River Black River Regulating District.
The project works include a 1,646-foot long by 112-foot high earthen barrage with a concrete gated déversoir. The dam was constructed in 1951. The dam impounds a 480-acre reservoir which extend about 3 miles upstream to the tailwaters of the E.J. West project at the Conklingville Barrage. Water is conveyed through a 216‐foot‐long steel conduite forcée to the main centrale. A 275‐foot‐long penstock connected to the main penstock conveys water to the minimum flow powerhouse which was constructed in 2013. The main powerhouse contains one vertical Turbine Francis with a capacity of 30 MW and the minimum flow powerhouse contains one axial flow unit with a capacity of 2.55 MW. The FERC project boundary covers 700 acres (210 acres of land and 490 acres of water).
The project operates with a 1.0‐foot impoundment fluctuation limit. A débit de base between 300 and 350 cfs is required year round based on the reservoir elevation. The project generates approximately 126,105 MWh annually and operates as a culminant facility in tandem with E.J. West.
Nom du projet | Stewart’s Bridge |
Numéro de certificat LIHI | 171 |
Durée du certificat LIHI | June 25, 2020 – June 24, 2025 |
Propriétaire | Erie Boulevard Hydropower LP |
État | New York |
Emplacement | River mile 3, Sacandaga River |
Capacité installée | 32.55 MW |
Génération annuelle moyenne | 126,105 MWh |
Type d'établissement | Point culminant |
FERC No. | 2047 issued in 2002, expires August 31, 2042 |
Fichiers:
Décision préliminaire – Certification du projet de barrage Wells, en attente LIHI #203, WA
En savoir plus