
初步决定 - 重新认证克罗克大坝项目,LIHI #127,MA
2020 年 10 月 30 日
最终决定 – 重新认证 Ashton 项目,LIHI #61
2020 年 11 月 5 日Lexington MA (October 30, 2020): The Low Impact Hydropower Institute has received a complete application for Low Impact recertification of the West Branch St. Regis Hydroelectric Project located on the Saranac River, NY. The complete application can be found 这里.
LIHI 正在就此申请征询公众意见。与特定 LIHI 标准(流量、水质、 鱼道, etc.) will be most helpful, but all
comments will be considered. Comments may be submitted to the Institute by e-mail at comments@lowimpacthydro.org 主题行为“West Branch St. Regis 项目评论”,或邮寄至 Low Impact Hydropower Institute,地址为 329 Massachusetts Avenue, Suite 6, Lexington, MA 02420。 Comments must be received on or
before 5 pm Eastern time on December 29, 2020 予以考虑。所有评论都将发布到网站上,申请人将有机会作出回应。任何回应也将发布。
北安普夸项目,LIHI #69 OR – 已收到完整的重新认证申请
阅读更多