Preliminary Decision – Recertification of the Crocker Dam Project, LIHI #127, MA
10 月 30, 2020Final Decision – Recertification of the Ashton Project, LIHI #61
11 月 5, 2020Lexington MA (October 30, 2020): The Low Impact Hydropower Institute has received a complete application for Low Impact recertification of the West Branch St. Regis Hydroelectric Project located on the Saranac River, NY. The complete application can be found 这里.
LIHI is seeking public comment on this application. Comments that are directly tied to specific LIHI criteria (flows, water quality, 鱼道, etc.) will be most helpful, but all
comments will be considered. Comments may be submitted to the Institute by e-mail at comments@lowimpacthydro.org with “West Branch St. Regis Project Comments” in the subject line, or by mail addressed to the Low Impact Hydropower Institute, 329 Massachusetts Avenue, Suite 6, Lexington, MA 02420. Comments must be received on or
before 5 pm Eastern time on December 29, 2020 予以考虑。所有评论都将发布到网站上,申请人将有机会作出回应。任何回应也将发布。
初步决定 – 威尔斯大坝项目认证,等待 LIHI #203,WA
阅读更多