初步决定 - 重新认证自动化项目,LIHI #72,ME
2021年5月17日
初步决定 - 重新认证虹吸发电项目,LIHI #73,俄勒冈州
2021年5月18日May 18, 2021: The Low Impact Hydropower Institute (LIHI) has preliminarily approved the Hunts Pond Project (LIHI #125) for a new 5-year term of Low Impact Certification. The certification includes one condition:
- Condition 1: By December 31, 2021 the facility Owner shall demonstrate 联邦能源管理委员会’s approval of the Stream Flow Compliance Plan dated 1/26/2016 and filed with FERC on May 1, 2017 by submitting to LIHI either a copy of a pre-existing FERC approval as requested in the Plan submittal, or a letter to FERC requesting approval, and the FERC approval issuance within 60 days of receiving it from FERC.
此决定是初步决定,需等待 30 天的申诉期。只有在 60 天的评论期内对初始申请发表评论的人才有资格提出上诉。此类上诉需要说明该项目为何不符合 LIHI 标准。上诉请求可以通过电子邮件提交至 comments@lowimpacthydro.org with “Hunts Pond Project” in the subject line, or by mail addressed to the Low Impact Hydropower Institute, 1167 Massachusetts Ave, Office 407, Arlington, MA 02476.
所有请求都将发布到网站上。申请人将有机会作出回应,任何回应也将公布。 Requests must be received by 5 pm Eastern time on June 17, 2021。完整申请和审核报告可供查看 这里.
If no appeal requests are received and the decision becomes final, the Certification term for the Project will be February 11, 2021 through February 10, 2026.
北安普夸项目,LIHI #69 OR – 已收到完整的重新认证申请