Preliminary Decision – Recertification of the Stevens Mill Project, LIHI #123
7 月 31, 2020Sherman Island Project – Preliminary Decision, pending LIHI #177
8 月 3, 2020October 20, 2020: The Low Impact Hydropower Institute (LIHI) preliminarily approved Low Impact Certification (pending LIHI #172) for the Glens Falls Hydroelectric Project located on the Hudson River in New York.
此决定是初步决定,需等待 30 天的申诉期。只有在 60 天的评论期内对初始申请发表评论的人才有资格提出上诉。此类上诉需要说明该项目为何不符合 LIHI 标准。上诉请求可以通过电子邮件提交至 comments@lowimpacthydro.org with “Glens Falls Project” in the subject line, or by mail addressed to the Low Impact Hydropower Institute, 329 Massachusetts Ave, Suite 6, Lexington, MA 02420. All requests will be posted to the website. The applicant will have an opportunity to respond and any response will also be posted. Requests must be received by 5 pm Eastern time on November 19, 2020.
The full application and review report are available below. If no appeal requests are received the certification term will be July 30, 2020 through July 29, 2025.
August 3, 2020: The Low Impact Hydropower Institute has received a complete application for Low Impact Certification of the Glens Falls Hydroelectric Project. LIHI is seeking public comment on this application. Specifically, we are interested in knowing whether you think the Project meets the LIHI Low Impact Certification Criteria, as revised in the 2nd Edition Handbook. The Project’s application materials can be found below.
Comments that are directly tied to specific LIHI criteria (flows, water quality, 鱼道等)将非常有帮助,但所有评论都会被考虑。评论可以通过电子邮件提交给研究所 comments@lowimpacthydro.org with “Glens Falls Project Comments” in the subject line, or by mail addressed to the Low Impact Hydropower Institute, 329 Massachusetts Avenue, Suite 6, Lexington, MA 02420. Comments must be received on or before 5 pm Eastern time on October 2, 2020 予以考虑。所有评论都将发布到网站上,申请人将有机会作出回应。任何回应也将发布。
项目描述:
The Glens Falls Project (联邦能源管理委员会 No. 2385) is located at river mile 200.7 on the Hudson River in the towns of Moreau, Saratoga County, and Glens Falls, Warren County, NY.
The project was originally constructed in 1906. Project works include a portion of seven, 7.5-foot tall by 57-foot long hydraulically operated steel crest 门 anchored on a 5-foot high concrete base. The 坝 impounds a reservoir of 167 acres with a useable storage volume of 560 acre-feet. The watershed area at the project is 2,817 square miles.
Water is conveyed to the 发电站 and to a paper mill via a 550-foot long power 运河. The powerhouse contains five horizonal 弗朗西斯式水轮机 generators with a combined capacity of 12.7 MW. A separate small dam and powerhouse located on the south side of the river is part of the unaffiliated South Glens Falls Project (No. 5461). Generally, both FERC licensees have agreed to equally share inflow to the reservoir (50 percent split) when flows are less than 8,400 cfs.
The Glens Falls Project operates in a 径流 mode with average annual generation of 56,150 MWh. 扣押 fluctuations are limited to 6 inches. A minimum flow of 5 cfs is provided in the 600-foot long bypassed reach to maintain water quality by preventing water stagnation and provide sufficient flow to adequately protect the limited aquatic habitat in the bypassed reach.
项目名称 | Glens Falls |
所有者 | FH OPCO, LLC (a subsidiary of Brookfield Renewable Energy Group) |
状态 | 纽约 |
地点 | River mile 200.7, Hudson River |
装机容量 | 12.7 MW |
平均年发电量 | 56,150 MWh |
设施类型 | 河流径流 |
联邦能源管理委员会编号 | P-2385 issued in 2001, expires October 31, 2041 |