最終決定 – 布拉多克船閘和大壩工程認證,LIHI #190
2022年7月28日
最終決定 – 美國組織項目認證,LIHI #191
2022年8月9日2022年8月1日: The Low Impact Hydropower Institute has issued a final decision on the recertification of the Vergennes Project located on Otter Creek in Vermont. The 30-day appeal window closed on July 21, 2022 and no appeals were filed. Therefore, the decision to recertify the project is now final. The new term is December 30, 2021 through December 29, 2031 in accordance with the term extension that became effective January 1, 2022 in Revision 2.05 of the LIHI 2nd 版本認證手冊。
第二次公眾意見徵詢期-華盛頓州威爾斯大壩項目
閱讀更多