Preliminary Decision – Recertification of the Bear River Project, LIHI #53, ID
août 24, 2023Jordanelle Project, LIHI #29 – Complete Application Received
septembre 14, 2023September 5, 2023: The Low Impact Hydropower Institute (LIHI) has received a complete recertification application from Massachusetts Water Resource Authority for the Cosgrove Project located at the Cosgrove Admission on the Cosgrove Aqueduct in Massachusetts. LIHI is seeking comment on this application. Comments that are directly tied to specific LIHI criteria (flows, water quality, passage des poissons, etc.) will be most helpful, but all comments will be considered. Comments may be submitted to LIHI by e-mail at commentaires@lowimpacthydro.org with “Cosgrove Project Comments” in the subject line, or by mail addressed to the Low Impact Hydropower Institute, 1167 Massachusetts Avenue, Arlington, MA 02476. Comments must be received at the Institute on or before 5 pm Eastern time on November 6, 2023 to be considered. Tous les commentaires seront publiés sur le site Web et le candidat aura la possibilité d'y répondre. Toute réponse sera également publiée.
La description du projet et la candidature complète peuvent être trouvées ICI.
Décision préliminaire – Certification du projet de barrage Wells, en attente LIHI #203, WA
En savoir plus