8 décembre 2022

Demande complète reçue – Projet South Berwick, NH/ME

8 décembre 2022 : Le Low Impact Hydropower Institute a reçu une demande complète de Green Mountain Power Corporation pour le projet hydroélectrique de South Berwick situé sur le […]
6 décembre 2022

Projet Raystown, LIHI #23 – Demande complète reçue

December 6, 2022: The Low Impact Hydropower Institute (LIHI) has received a complete recertification application from Allegheny Electric Cooperative, Inc. for the Raystown Project located on […]
28 novembre 2022

Décision préliminaire – Recertification du projet Upper Raquette River, LIHI #14A, NY

November 28, 2022: The Low Impact Hydropower Institute (LIHI) has preliminarily approved the Upper Raquette River Project (LIHI #14A) located on the Raquette River in New […]
16 novembre 2022

Pelton Round Butte Project, LIHI #25 – Complete Application Received

November 16, 2022: The Low Impact Hydropower Institute (LIHI) has received a complete recertification application from Portland General Electric and the Confederated Tribes of the Warm […]
10 novembre 2022

Décision préliminaire – Certification du projet High Falls, en attente LIHI #192, NY

November 10, 2022:  The Low Impact Hydropower Institute (LIHI) has preliminarily approved Low Impact Certification (pending LIHI #192) for the High Falls Hydroelectric Project located on the […]
26 septembre 2022

Demande complète reçue – Écluse et barrage de Meldahl, OH, KY

September 26, 2022: The Low Impact Hydropower Institute has received a complete application for Low Impact Certification of the Meldahl Hydroelectric Project located on the Ohio […]
26 septembre 2022

Complete Application Received – Belleville Locks and Dam, OH, WV

September 26, 2022: The Low Impact Hydropower Institute has received a complete application for Low Impact Certification of the Belleville Hydroelectric Project located on the Ohio […]
30 août 2022

Décision finale – Recertification du projet Fifteen Mile Falls, LIHI #39

August 30, 2022: The Low Impact Hydropower Institute has issued a final decision on the recertification of the Fifteen Mile Falls Project.  The 30-day appeal window […]
30 août 2022

Upper Raquette River Project, LIHI #14A – Complete Application Received

August 30, 2022: The Low Impact Hydropower Institute (LIHI) has received a complete recertification application from Erie Boulevard Hydropower, LP, a subsidiary of Brookfield Renewable Energy […]