Décision préliminaire – Recertification du projet de barrage Crocker, LIHI #127, MA
30 octobre 2020Final Decision – Recertification of the Ashton Project, LIHI #61
novembre 5, 2020Lexington MA (October 30, 2020): The Low Impact Hydropower Institute has received a complete application for Low Impact recertification of the West Branch St. Regis Hydroelectric Project located on the Saranac River, NY. The complete application can be found ICI.
LIHI is seeking public comment on this application. Comments that are directly tied to specific LIHI criteria (flows, water quality, passage des poissons, etc.) will be most helpful, but all
comments will be considered. Comments may be submitted to the Institute by e-mail at commentaires@lowimpacthydro.org with “West Branch St. Regis Project Comments” in the subject line, or by mail addressed to the Low Impact Hydropower Institute, 329 Massachusetts Avenue, Suite 6, Lexington, MA 02420. Comments must be received on or
before 5 pm Eastern time on December 29, 2020 à prendre en considération. Tous les commentaires seront publiés sur le site Web et le candidat aura la possibilité d'y répondre. Toute réponse sera également publiée.
Décision préliminaire – Certification du projet de barrage Wells, en attente LIHI #203, WA
En savoir plus