Glens Falls Project – Complete Application Received
août 3, 2020Final Decision – Recertification of the Bowersock Mills Project, LIHI #15
août 4, 2020Lexington MA (August 3, 2020): The Low Impact Hydropower Institute has received a complete application for Low Impact Certification of the Sherman Island Hydroelectric Project. LIHI is seeking public comment on this application. Specifically, we are interested in knowing whether you think the Project meets the LIHI Low Impact Certification Criteria, as revised in the 2nd Edition Handbook. The Project’s application materials can be found ICI.
Comments that are directly tied to specific LIHI criteria (flows, water quality, passage des poissons, etc.) seront très utiles, mais tous les commentaires seront pris en compte. Les commentaires peuvent être soumis à l'Institut par courrier électronique à l'adresse commentaires@lowimpacthydro.org with “Sherman Island Project Comments” in the subject line, or by mail addressed to the Low Impact Hydropower Institute, 329 Massachusetts Avenue, Suite 6, Lexington, MA 02420. Comments must be received on or before 5 pm Eastern time on October 2, 2020 à prendre en considération. Tous les commentaires seront publiés sur le site Web et le candidat aura la possibilité d'y répondre. Toute réponse sera également publiée.
Décision préliminaire – Certification du projet de barrage Wells, en attente LIHI #203, WA
En savoir plus