Preliminary Decision – Recertification of the Stevens Mill Project, LIHI #123
juillet 31, 2020Sherman Island Project – Preliminary Decision, pending LIHI #177
août 3, 2020October 20, 2020: The Low Impact Hydropower Institute (LIHI) preliminarily approved Low Impact Certification (pending LIHI #172) for the Glens Falls Hydroelectric Project located on the Hudson River in New York.
Cette décision est préliminaire en attendant la période d'appel de 30 jours. Seuls ceux qui ont commenté la demande initiale pendant la période de commentaires de 60 jours sont éligibles pour déposer un appel. Un tel appel doit inclure une explication sur la raison pour laquelle le projet ne répond pas aux critères du LIHI. Les demandes d'appel peuvent être soumises par courrier électronique à commentaires@lowimpacthydro.org with “Glens Falls Project” in the subject line, or by mail addressed to the Low Impact Hydropower Institute, 329 Massachusetts Ave, Suite 6, Lexington, MA 02420. All requests will be posted to the website. The applicant will have an opportunity to respond and any response will also be posted. Requests must be received by 5 pm Eastern time on November 19, 2020.
The full application and review report are available below. If no appeal requests are received the certification term will be July 30, 2020 through July 29, 2025.
August 3, 2020: The Low Impact Hydropower Institute has received a complete application for Low Impact Certification of the Glens Falls Hydroelectric Project. LIHI is seeking public comment on this application. Specifically, we are interested in knowing whether you think the Project meets the LIHI Low Impact Certification Criteria, as revised in the 2nd Edition Handbook. The Project’s application materials can be found below.
Comments that are directly tied to specific LIHI criteria (flows, water quality, passage des poissons, etc.) will be most helpful, but all comments will be considered. Comments may be submitted to the Institute by e-mail at commentaires@lowimpacthydro.org with “Glens Falls Project Comments” in the subject line, or by mail addressed to the Low Impact Hydropower Institute, 329 Massachusetts Avenue, Suite 6, Lexington, MA 02420. Comments must be received on or before 5 pm Eastern time on October 2, 2020 to be considered. All comments will be posted to the web site and the applicant will have an opportunity to respond. Any response will also be posted.
Project Description:
The Glens Falls Project (Fédération internationale de radio-télévision (FERC) No. 2385) is located at river mile 200.7 on the Hudson River in the towns of Moreau, Saratoga County, and Glens Falls, Warren County, NY.
The project was originally constructed in 1906. Project works include a portion of seven, 7.5-foot tall by 57-foot long hydraulically operated steel crest portes anchored on a 5-foot high concrete base. The barrage impounds a reservoir of 167 acres with a useable storage volume of 560 acre-feet. The watershed area at the project is 2,817 square miles.
Water is conveyed to the centrale and to a paper mill via a 550-foot long power canal. The powerhouse contains five horizonal Turbine Francis generators with a combined capacity of 12.7 MW. A separate small dam and powerhouse located on the south side of the river is part of the unaffiliated South Glens Falls Project (No. 5461). Generally, both FERC licensees have agreed to equally share inflow to the reservoir (50 percent split) when flows are less than 8,400 cfs.
The Glens Falls Project operates in a au fil de l'eau mode with average annual generation of 56,150 MWh. Impoundment fluctuations are limited to 6 inches. A minimum flow of 5 cfs is provided in the 600-foot long bypassed reach to maintain water quality by preventing water stagnation and provide sufficient flow to adequately protect the limited aquatic habitat in the bypassed reach.
Nom du projet | Glens Falls |
Propriétaire | FH OPCO, LLC (a subsidiary of Brookfield Renewable Energy Group) |
État | New York |
Emplacement | River mile 200.7, Hudson River |
Capacité installée | 12.7 MW |
Génération annuelle moyenne | 56,150 MWh |
Type d'établissement | Au fil de l'eau |
FERC No. | P-2385 issued in 2001, expires October 31, 2041 |