Preliminary Certification Decision - White River Project, Arkansas

2021 年 7 月 1 日: The Low Impact Hydropower Institute (LIHI) has preliminarily approved Low Impact Certification (pending LIHI #179, #180, #181) for the White River Lock and Dam No. 1, No. 2 and No. 3 Hydroelectric Projects located on the White River in Arkansas. The Certificates each include the following conditions:

條件一: Should the facility Owner receive notification during the term of this LIHI Certification from either USFWS or AGFC that upstream and/or downstream passage for anadromous or catadromous fish is required at any of the Projects, the Owner shall forward to LIHI a copy of that notification along with a summary of plans and a schedule to initiate consultation and implement passage; and shall provide a status update on implementation progress annual compliance statements.

Condition 2 (Optional): if at any time prior to six months before the expiration of the Certification terms for each Project the Owner voluntarily implements seasonal upstream eel passage at one or more of the Projects in the absence of an agency recommendation in Condition 1, LIHI will review that information and determine whether or not to award a PLUS standard and extend the Certificate term for three additional years.

該決定是初步決定,需等待 30 天的上訴期。只有在 60 天的評論期內對初始申請發表評論的人才有資格提出上訴。此類上訴需要包括有關該項目為何不符合 LIHI 標準的解釋。申訴請求可以透過電子郵件發送至 評論@lowimpactHydro.org 主題行為“White River Project”,或郵寄至 Low Impact Hydropower Institute, 1167 Massachusetts Ave, Arlington MA 02476。申請人將有機會回應,任何回應也將公佈。 Requests must be received by 5 pm Eastern time on July 31, 2021.

The full application and review report are available below. If no appeal requests are received the certification terms for each project will be June 9, 2021 – June 8, 2026 unless extended per Condition 2.

April 27, 2021: The Low Impact Hydropower Institute has received a complete application for Low Impact Certification of the White River Hydroelectric Project.  LIHI is seeking public comment on this application.  Specifically, we are interested in knowing whether you think the Project meets the LIHI Low Impact Certification Criteria, as revised in the 2nd Edition Handbook.  Please review the program and criteria in LIHI’s revised 手冊 然後審查下面的項目申請資料。與特定 LIHI 標準(流量、水質、魚通過等)直接相關的評論將是最有幫助的,但所有評論都會被考慮。意見可以透過電子郵件提交給研究所: 評論@lowimpactHydro.org with “White River Project Comments” in the subject line, or by mail addressed to the Low Impact Hydropower Institute, 1167 Massachusetts Avenue, Arlington, MA 02476. Comments must be received on or before 5 pm Eastern time on June 26, 2021 予以考慮。所有評論都將發佈到網站上,申請人將有機會回應。任何回應也將被發布。

White River Lock and Dam No. 1, Lock and Dam No. 2 and the “Shelby M. Knight” Lock and Dam No. 3 Hydroelectric Projects (LD1, LD2, LD3, or Projects) collectively known as the “White River Hydroelectric Project”, are located on the White River in Independence County (LD1 andLD2) and Stone County (LD3) in north central Arkansas. The Projects are located at existing and no longer used US Army Corps of Engineers (USACE) locks and dams on the 722-mile-long White River.

The river begins in northwestern Arkansas in the Boston Mountains and flows east toward Fayetteville where it then turns north. The river enters Missouri near Eureka Springs. It then flows southeast back into Arkansas past Bull Shoals, Mountain Home, and Calico Rock. At Batesville, the second section of the river, known as the Lower White, begins. From Batesville, the river flows south for another 295 miles through the Arkansas Delta region before emptying into the Mississippi River. The White River is a major tributary of the Mississippi River and has a drainage basin of 27,765 square miles. The river passes multiple lakes created by eight USACE dams.

LD1 is located in Batesville, AR at river mile (RM) 299.2. LD2 is about 8 miles upstream at RM308.3, and LD3 is another 12 miles upstream at RM 320.2. The USACE Bull Shoals Dam is located approximately 99 miles upstream of LD3. Discharges from Bull Shoals and Norfork Lakes as well as inflows from numerous tributaries control flows to the Projects. The LD1 Project is owned by the City of Batesville, and LD2 and LD3 are owned by Independence County, Arkansas. The Projects were originally licensed by the Federal Energy Regulatory Commission (FERC) prior to the hydro facility construction on November 8, 1985 (LD2) and February 28, 1986 (LD1, LD3) for terms of 50 years which expire in 2035 and 2036, respectively.

Between 1900 and 1908, USACE built the three timber-crib and concrete dams and locks associated with the Projects. The locks were used for navigation, moving boats containing shipments of timber, cotton, and mining products such as limestone and silica. By the mid-1950s, trains had replaced boats as the primary method for transporting these products. USACE decommissioned the locks and sold the properties. The locks were decommissioned and have not operated since. The city of Batesville purchased LD1 for $1, and LD2 and LD3 were sold to private interests which also did not operate the locks. Those Projects were subsequently resold to the current owners. No maintenance occurred from the 1950s until 1997 when the county, through the hydro project, did extensive remedial work on LD1. Development of the new hydropower capacity involved a utility, a college, a city, a county, the U.S. Congress, 27 years, myriad engineers and lawyers, and lots of tenacity and perseverance by a dedicated group of individuals.

The Projects operate in run-of-river mode and do not use impoundment storage, with inflow dependent upon releases from the upstream USACE storage dams along with tributary inflows.

The LD3 Project includes a concrete and timber crib dam approximately 750 feet long and 21 feet high with a 3-foot-high concrete cap added in 2010. The dam creates an impoundment with approximately 610,242 acre-feet of storage capacity and a surface area of 787 acres. The powerhouse contains a single vertical Kaplan generating unit rated at 4.3 MW. An open-flume tailrace returns flow to the river 300 feet downstream of the dam. The Project boundary encompasses the high-water mark and about 42 acres of land around Project structures.

LD2 includes a concrete and timber crib dam approximately 658 feet long and 29 feet high with an integral navigation lock approximately 175 feet long and 36 feet wide on the right side of the dam. A multi-level intake flume, approximately 120 feet long and 100 feet wide is located within the lock structure. The dam creates an impoundment with approximately 8,581 acre-feet of storage capacity and a surface area of approximately 1,072 acres. The powerhouse contains a single vertical Kaplan generating unit with a capacity of 3.9 MW. An open flume tailrace, approximately 120 feet long conveys water back to the river. The Project boundary encompasses the high-water mark and about 10 acres of land around Project structures.

LD1 consists of a 660-foot-long, 27.6-foot-high dam that creates an impoundment with approximately 12,500 acre-feet of storage and a surface area of 773 acres. The powerhouse contains a single vertical Kaplan generating unit with a capacity of 4.3 MW. An open-flume tailrace conveys water back to the river about 280 feet downstream of the dam. The Project boundary encompasses the high-water mark and about 25 acres of land around Project structures.

項目名稱 White River
擁有者 Independence County, Arkansas
狀態 阿肯色州
地點

LD3: RM 320.2

LD2: RM 308.3

LD1: RM 299.2

White River
裝置容量 12.5 MW

LD3: 4.3 MW

LD2: 3.9 MW

LD1: 4.3 MW

平均年發電量 51,410 MWh

LD3: 18,764 MWh

LD2: 15,423 MWh

LD1: 17,222 MWh

設施類型 Run-of-River
聯邦能源監管委員會編號

LD3: P-4659, issued 02/28/1986, expires 01/31/2036.

LD2: P-4660, issued 11/08/1985, expires 10/31/2035.

LD1: P-4204, issued 02/28/1986 expires 01/31/2036.