8 月 3, 2020Lexington MA (July 31, 2020): The Low Impact Hydropower Institute (LIHI) has preliminarily approved the Stevens Mill Project (LIHI #123) for a new 5-year term of Low Impact Certification. The Certificate includes the following conditions:
條件一: The facility Owner shall report in its annual compliance submittals to LIHI, on any changes or amendments to the 協議備忘錄, any changes in requirements under the MOA, or if modifications have been made to the Operations and Flow Monitoring Plan. If any changes were made, the facility owner will provide a brief summary of those changes.
條件2: The facility Owner shall conduct forebay dredging in 2020 if site conditions allow, or as soon as conditions do allow. The Owner shall continue to consult with resource agencies on downstream passage in accordance with the MOA and shall notify LIHI of any changes in downstream passage measures in annual compliance submittals.
該決定是初步決定,需等待 30 天的上訴期。只有在 60 天的評論期內對初始申請發表評論的人才有資格提出上訴。此類上訴需要包括有關該項目為何不符合 LIHI 標準的解釋。申訴請求可以透過電子郵件發送至 評論@lowimpactHydro.org with “Stevens Mill Project” in the subject line, or by mail addressed to the Low Impact Hydropower Institute, 329 Massachusetts Ave, Suite 6, Lexington, MA 02420. All requests will be posted to the website. The applicant will have an opportunity to respond and any response will also be posted. Requests must be received by 5 pm Eastern time on August 30, 2020. The full application and reviewer’s report are available 這裡.
If no appeal requests are received and the decision becomes final, the Certification term for the Project will be March 5, 2020 through March 4, 2025.