LIHI Certificate #56 - Loring Road Project, Massachusetts

項目名稱 | Loring Road |
理海證書編號 | 56 |
LIHI 證書期限 | 2023 年 4 月 14 日 – 2038 年 4 月 13 日 |
擁有者 | 馬薩諸塞州水資源管理局 |
狀態 | 麻薩諸塞州 |
地點 | Located in a valve chamber at the Loring Road Covered Storage Facility in Weston, Massachusetts. |
裝置容量 | 0.2 MW |
平均年發電量 | 836 MWH |
設施類型 | 導管 |
聯邦能源監管委員會 不。 | P-13400 exempt 2009 |
The Loring Road Project is located in a valve chamber at the Massachusetts Water Resources Authority’s (MWRA) Loring Road Covered Storage Facility in Weston, Massachusetts. The MWRA supplies wholesale water to local water departments in 50 communities, primarily in the Boston metropolitan area. MWRA’s water comes from the Quabbin 水庫, about 65 miles west of Boston, and the Wachusett Reservoir, about 35 miles west of Boston. Both Quabbin and Wachusett Reservoirs are man-made reservoirs, constructed for water supply purposes. The conduit hydro project was completed and became operational in 2010.
The MWRA transmission system consists of over 100 miles of tunnels and aqueducts that transports water largely by gravity to points of distribution within the MWRA service area. There are three locations within this water transmission system where hydroelectric facilities are located. These include Oakdale facility (LIHI #57) at the end of the Quabbin Aqueduct; the Cosgrove 攝取量 到 科斯格羅夫渡槽 (LIHI #55); and the Loring Road Covered Storage Facility.
The hydroelectric facility generates power from fully treated potable water as it is transferred via a pipeline from one covered water supply storage tank in MWRA’s water distribution system (Norumbega) to another covered storage tank (Loring Road). The hydro facility’s operation is driven by water demand in MWRA’s Low Service area and does not influence or affect withdrawals from MWRA’s source reservoirs more than 30 miles away.
Loring Road Covered Storage establishes the hydraulic grade line of the MWRA’s Low Service Area (areas of lower elevation within the MWRA service area). The water reaches Loring Road at a hydraulic grade line of approximately 282 feet. At Loring Road, the flow is divided; some flow is directed to a supply pipeline serving MWRA’s High Service system, while other flow is directed to pressure reducing valves inside Valve Chamber One, an underground valve chamber. Either the hydro turbine or sleeve valves, or both when water demand is high, are used to reduce the grade line to approximately 200 feet.
After the hydro turbine or pressure reducing valves, water is sent via a pipeline to a second valve chamber that directs flows to either Loring Road Storage Tank One or Two. A steady flow rate of 20 million gallons per day can be discharged from Valve Chamber One into the tanks on a nearly constant basis. From the tanks, flow is discharged to downstream pipelines (Weston Aqueduct Supply Mains) serving MWRA’s Low Service Area. The 200-kW hydro turbine driven generator provides energy recovery along with the primary purpose of the Loring Road facility to regulate flow and provide a constant pressure water supply to the low service system. The Loring Road Storage Facility operates 24/7, and the hydroelectric facility is integrated into existing operations. The power produced is distributed to the electrical grid and generates income for MWRA.
The project operates as a conduit facility. Waters are transferred from one water supply tank to another and do not discharge into a river.
工程範圍內的水用於供水目的,因此水質優良,可飲用。
由於該項目的管道性質,魚類通道既沒有必要也不可行。
The facility is located in a water distribution facility and the DCR’s Division of Water Supply is responsible for shoreline protection.
The hydropower facility is located entirely within the water supply facility, and entirely underground. As such, there are no impacts to shorelines or the watershed. MWRA maintains a partnership with the DCR’s Division of Water Supply Protection, which is responsible for managing the activities within the watershed funded by MWRA.
There are no threatened or endangered species potentially present at the project. Similarly, no cultural or historic resources exist in the hydro project.
The project is located at a public water supply transfer facility, which restricts public access to the project area.
合規狀態
目前證書中沒有針對設施的特定條件。
2024: 未發現重大變更或合規問題。根據年度審查,該項目仍符合規定。
2023: 目前證書的年度報告尚未生效。
認證歷史
2024 年 2 月 6 日: The Low Impact Hydropower Institute has issued a final decision on the recertification of the Loring Road Hydroelectric Project. The new certification term is April 14, 2023 through April 13, 2038
2024 年 1 月 3 日: The Low Impact Hydropower Institute has preliminarily approved Low Impact recertification for the Loring Road Hydroelectric Project. The full application and reviewer’s report are available below. This decision is preliminary pending the 30-day appeal window. Only those who commented on the initial application during the 60-day comment period are eligible to file an appeal. Such appeal needs to include an explanation as to how the Project does not meet the LIHI criteria. Appeal requests can be submitted by email to 評論@lowimpactHydro.org 主題行為“Loring Road Project”,或郵寄至 Low Impact Hydropower Institute, 1167 Massachusetts Ave, Arlington, MA 02476。申請人將有機會回應,任何回應也將公佈。 請求必須在 2024 年 2 月 2 日東部時間下午 5 點前收到。 如果沒有收到上訴請求,認證期限將為 2023 年 4 月 14 日至 2038 年 4 月 13 日。
2023 年 10 月 24 日: The Low Impact Hydropower Institute (LIHI) has received a complete recertification application from Massachusetts Water Resource Authority for the Loring Road Project. LIHI is seeking comment on this application. Comments that are directly tied to specific LIHI criteria (flows, water quality, 魚道等等)將非常有幫助,但所有評論都會被考慮。意見可以透過電子郵件提交給 LIHI,郵箱地址為 評論@lowimpactHydro.org 主題行為“Loring Road 專案評論”,或郵寄至 Low Impact Hydropower Institute, 1167 Massachusetts Avenue, Arlington, MA 02476。 評論必須在 2023 年 12 月 23 日東部時間下午 5 點或之前送達研究所,以供考慮。 All comments will be posted to the web site and the applicant will have an opportunity to respond. Any response will also be posted. The project description and complete application can be found below.
2015年12月7日: LIHI Executive Director Michael J. Sale, using authority delegated from the LIHI Governing Board, has certified that the Loring Road Hydroelectric Project (FERC No. P-13400) continues to satisfy the LIHI Certification Criteria. A Preliminary Decision was announced on December 14, 2015, and a 30-day appeal period was open through January 14, 2016. No requests for appeal were received. The effective certification date for the Loring Road Project is April 14, 2015 for an eight (8) year term, which will expire on April 14, 2023.
2015年10月22日: The Loring Road Hydroelectric Project has been granted an additional extension; the new expiration date is December 31, 2015.
2015 年 9 月 30 日 – The Low Impact Hydropower Institute received a complete application for a new term of Low Impact Certification for the Loring Road Hydroelectric project on September 21, 2015. The application materials can be found in the Files section below. The public comment period for this application closed on November 30, 2015.
2015年6月19日: The Loring Road Hydroelectric Project has been granted an extension of the current certificate term. The new expiration date is October 11, 2015. See ExtensionLetter_2015Recert for explanation below.
2010年7月21日: The Loring Road Hydroelectric Project has been certified as low impact. Because construction of the Loring Road facility is not expected to be complete until fall of 2010, LIHI certification is granted for an 18 month term beginning on April 14, 2010, with the certification extended for an additional 42 months should the applicant demonstrate to LIHI that it has complied with the conditions contained in the FERC 豁免.
2010 年 6 月 14 日: 有關該認證申請的公眾意見徵詢期已經結束。
2010 年 6 月 9 日: LIHI received a comment letter from the USFWS on the Loring Road project. It can be read in the Files section below.
May 4, 2010: LIHI received a comment letter from Dr. David Westerling, P.E. of the Department of Civil Enginerring at Merrimack College. It can be found in the Files section below.
2010年4月14日: The Massachusetts Water Resources Authority has submitted an application for the certification of the Loring Road Hydro Project. A public comment period will remain open for 60 days.
認證文件
2023 年重新認證
2015 年重新認證
- Loring Road Recertification Review Report 2015
- Massachusetts Division of Fisheries and Wildlife Comment Letter – Loring Road Recertification
- Loring Road Recertification Application
2010年認證
- Loring Road Certification Review Report
- Loring Road Description
- Loring Road Certification Questionnaire
- David Westerling Comment Letter – Loring Road Certification
- US Fish and Wildlife Service Comment Letter – Loring Road Certification
- 麻薩諸塞州環境保護署意見函 2010
關鍵文件