
Preliminary Decision – Recertification of the Stevens Mill Project, LIHI #123
2020 年 7 月 31 日
Sherman Island Project – Preliminary Decision, pending LIHI #177
2020 年 8 月 3 日2020年10月20日: The Low Impact Hydropower Institute (LIHI) preliminarily approved Low Impact Certification (pending LIHI #172) for the Glens Falls Hydroelectric Project located on the Hudson River in New York.
該決定是初步決定,需等待 30 天的上訴期。只有在 60 天的評論期內對初始申請發表評論的人才有資格提出上訴。此類上訴需要包括有關該項目為何不符合 LIHI 標準的解釋。申訴請求可以透過電子郵件發送至 評論@lowimpactHydro.org with “Glens Falls Project” in the subject line, or by mail addressed to the Low Impact Hydropower Institute, 329 Massachusetts Ave, Suite 6, Lexington, MA 02420. All requests will be posted to the website. The applicant will have an opportunity to respond and any response will also be posted. Requests must be received by 5 pm Eastern time on 2020 年 11 月 19 日.
The full application and review report are available below. If no appeal requests are received the certification term will be July 30, 2020 through July 29, 2025.
2020 年 8 月 3 日: The Low Impact Hydropower Institute has received a complete application for Low Impact Certification of the Glens Falls Hydroelectric Project. LIHI is seeking public comment on this application. Specifically, we are interested in knowing whether you think the Project meets the LIHI Low Impact Certification Criteria, as revised in the 2nd Edition Handbook. The Project’s application materials can be found below.
與特定 LIHI 標準(流量、水質、 魚道等等)將非常有幫助,但所有評論都會被考慮。意見可以透過電子郵件提交給研究所 評論@lowimpactHydro.org 主題行為“Glens Falls 計畫評論”,或郵寄至低影響水力發電研究所,地址為:329 Massachusetts Avenue, Suite 6, Lexington, MA 02420。 評論必須在 2020 年 10 月 2 日東部時間下午 5 點或之前收到 有待考慮。所有評論都將發佈到網站上,申請人將有機會回應。任何回覆也會公佈。
項目描述:
The Glens Falls Project (聯邦能源監管委員會 No. 2385) is located at river mile 200.7 on the Hudson River in the towns of Moreau, Saratoga County, and Glens Falls, Warren County, NY.
The project was originally constructed in 1906. Project works include a portion of seven, 7.5-foot tall by 57-foot long hydraulically operated steel 波尖峰 蓋茲 anchored on a 5-foot high concrete base. The 壩 impounds a reservoir of 167 acres with a useable storage volume of 560 acre-feet. The watershed area at the project is 2,817 square miles.
Water is conveyed to the 發電站 and to a paper mill via a 550-foot long power 運河. The powerhouse contains five horizonal 混流式水輪機 generators with a combined capacity of 12.7 MW. A separate small dam and powerhouse located on the south side of the river is part of the unaffiliated South Glens Falls Project (No. 5461). Generally, both FERC licensees have agreed to equally share inflow to the reservoir (50 percent split) when flows are less than 8,400 cfs.
The Glens Falls Project operates in a 徑流 mode with average annual generation of 56,150 MWh. 扣押 fluctuations are limited to 6 inches. A minimum flow of 5 cfs is provided in the 600-foot long bypassed reach to maintain water quality by preventing water stagnation and provide sufficient flow to adequately protect the limited aquatic habitat in the bypassed reach.

項目名稱 | 格倫斯福爾斯 |
擁有者 | FH OPCO, LLC (a subsidiary of Brookfield Renewable Energy Group) |
狀態 | 紐約 |
地點 | River mile 200.7, Hudson River |
裝置容量 | 12.7 兆瓦 |
平均年發電量 | 56,150 兆瓦時 |
設施類型 | 河流的奔流 |
聯邦能源監管委員會編號 | P-2385 issued in 2001, expires October 31, 2041 |
文件:
北安普誇項目,LIHI #69 OR – 已收到完整的重新認證申請
閱讀更多