已收到完整申請 – 肯塔基州俄亥俄州梅爾達爾水閘和大壩
2022年9月26日
Pelton Round Butte 項目,LIHI #25 – 已收到完整申請
2022 年 11 月 16 日November 10, 2022: The Low Impact Hydropower Institute (LIHI) has preliminarily approved Low Impact Certification (pending LIHI #192) for the High Falls Hydroelectric Project located on the Deer River in NY. The full application and reviewer’s report are available 這裡。
該決定是初步決定,需等待 30 天的上訴期。只有在 60 天的評論期內對初始申請發表評論的人才有資格提出上訴。此類上訴需要包括有關該項目為何不符合 LIHI 標準的解釋。申訴請求可以透過電子郵件發送至 評論@lowimpactHydro.org with “American Tissue Project” in the subject line, or by mail addressed to the Low Impact Hydropower Institute, 1167 Massachusetts Ave. Arlington, MA 02476. All requests will be posted to the website. The applicant will have an opportunity to respond and any response will also be posted. Requests must be received by 5 pm Eastern time on December 10, 2022.
If no appeal requests are received the certification term will be October 4, 2022 through October 3, 2032.
北安普誇項目,LIHI #69 OR – 已收到完整的重新認證申請
閱讀更多