2021年5月18日2021年5月18日: The Low Impact Hydropower Institute (LIHI) has preliminarily approved the Hunts Pond Project (LIHI #125) for a new 5-year term of Low Impact Certification. The certification includes one condition:
- Condition 1: By December 31, 2021 the facility Owner shall demonstrate 聯邦能源監管委員會’s approval of the Stream Flow Compliance Plan dated 1/26/2016 and filed with FERC on May 1, 2017 by submitting to LIHI either a copy of a pre-existing FERC approval as requested in the Plan submittal, or a letter to FERC requesting approval, and the FERC approval issuance within 60 days of receiving it from FERC.
該決定是初步決定,需等待 30 天的上訴期。只有在 60 天的評論期內對初始申請發表評論的人才有資格提出上訴。此類上訴需要包括有關該項目為何不符合 LIHI 標準的解釋。申訴請求可以透過電子郵件發送至 評論@lowimpactHydro.org with “Hunts Pond Project” in the subject line, or by mail addressed to the Low Impact Hydropower Institute, 1167 Massachusetts Ave, Office 407, Arlington, MA 02476.
所有請求都將發佈到網站上。申請人將有機會回應,任何回應也將公佈。 申請必須在 2021 年 6 月 17 日美國東部時間下午 5 點前收到。完整申請和審核報告均可使用 這裡.
如果沒有收到上訴請求且決定成為最終決定,則該計畫的認證期限為 2021 年 2 月 11 日至 2026 年 2 月 10 日。