
Décision finale – Certification du projet Bolton Falls, LIHI #201, VT
21 mai 2024
Décision finale – Certification du projet Lower Great Falls, LIHI #202, NH/ME
20 juin 2024May 28, 2024: The Low Impact Hydropower Institute (LIHI) has received a complete application from the Public Utility District No. 1 of Douglas County for the Wells Barrage Project located on the Columbia River in Washington.
LIHI is seeking comment on this application. Comments that are directly tied to specific LIHI criteria (flows, water quality, passage des poissons, etc.) seront très utiles, mais tous les commentaires seront pris en compte. Les commentaires peuvent être envoyés au LIHI par courrier électronique à l'adresse commentaires@lowimpacthydro.org with “Wells Dam Project Comments” in the subject line, or by mail addressed to the Low Impact Hydropower Institute, 1167 Massachusetts Avenue, Arlington, MA 02476. Comments must be received at the Institute on or before 5 pm Eastern time on July 27, 2024 to be considered. All comments will be posted to the web site and the applicant will have an opportunity to respond. Any response will also be posted.
La description du projet et la candidature complète peuvent être trouvées ICI.
Comment Period Open – Draft Definition of Low Impact Pumped Storage Hydro
En savoir plus