Bonny Eagle Project, ME – Complete Application Received
janvier 11, 2021Preliminary Decision – Certification of the Freedom Falls Project, pending LIHI #178
20 janvier 2021January 12, 2021: The Low Impact Hydropower Institute has received a complete application for Low Impact recertification of the Texon Hydroelectric Project located on the Westfield river in Massachusetts. The complete application can be found ICI.
LIHI is seeking public comment on this application. Comments that are directly tied to specific LIHI criteria (flows, water quality, passage des poissons, etc.) seront très utiles, mais tous les commentaires seront pris en compte. Les commentaires peuvent être soumis à l'Institut par courrier électronique à l'adresse commentaires@lowimpacthydro.org with “Texon Project Comments” in the subject line, or by mail addressed to the Low Impact Hydropower Institute, 1167 Massachusetts Avenue, Arlington MA 02476. Comments must be received on or before 5 pm Eastern time on March 13, 2021 à prendre en considération. Tous les commentaires seront publiés sur le site Web et le candidat aura la possibilité d'y répondre. Toute réponse sera également publiée.
Décision préliminaire – Certification du projet de barrage Wells, en attente LIHI #203, WA
En savoir plus