
Demande complète reçue – Écluses et barrage de Braddock, Pennsylvanie
30 mars 2022
Holtwood, LIHI #116 Période de commentaires sur la recertification prolongée
4 avril 202231 mars 2022 : The Low Impact Hydropower Institute has received a complete application for Low Impact Certification of the Brassua Project located on the Moose River in Maine. LIHI is seeking public comment on this application. Specifically, we are interested in knowing whether you think the Project meets the LIHI Low Impact Certification Criteria, as revised in the 2nd Edition Handbook. Please review the program and criteria in LIHI’s revised Manuel and then review the Project’s application materials ICI.
Commentaires directement liés à des critères spécifiques du LIHI (débits, qualité de l'eau, passage des poissons, etc.) will be most helpful, but all comments will be considered. Comments may be submitted to the Institute by e-mail at comments@lowimpacthydro.org with “Brassua Project Comments” in the subject line, or by mail addressed to the Low Impact Hydropower Institute, 1167 Massachusetts Avenue, Arlington, MA 02476. Les commentaires doivent être reçus au plus tard à 17 heures, heure de l'Est, le 30 mai 2022. à prendre en considération. Tous les commentaires seront publiés sur le site Web et le candidat aura la possibilité d'y répondre. Toute réponse sera également publiée.
Deuxième période de consultation publique – Projet de barrage Wells, Washington
En savoir plus