LIHI Certificate #181 – White River Lock and Dam No. 3 Project, Arkansas

Nom du projet Écluse de White River et Barrage No. 3
Numéro de certificat LIHI 181
Durée du certificat LIHI 9 juin 2021 – 8 juin 2031 (option de prolongation jusqu'au 8 juin 2034)
Propriétaire Comté d'Independence, Arkansas
État Arkansas
Emplacement River mile 320.2 on the White River
Capacité installée 4,3 MW
Génération annuelle moyenne 18,764 MWh
Type d'établissement Au fil de l'eau
Fédération internationale de radio-télévision (FERC) Non. P-4659, issued in 1986, expires 01/31/2036.

Écluse et barrage n° 1 de White River (LIHI #179), Lock and Dam No. 2 (LIHI #180), and the “Shelby M. Knight” Lock and Dam No. 3 Hydroelectric Projects (LD1, LD2, LD3) collectively known as the “White River Hydroelectric Project”, are located on the White River in north central Arkansas. The river begins in northwestern Arkansas in the Boston Mountains and flows east toward Fayetteville where it then turns north. The river enters Missouri near Eureka Springs. It then flows southeast back into Arkansas past Bull Shoals, Mountain Home, and Calico Rock. At Batesville, the second section of the river, known as the Lower White, begins. From Batesville, the river flows south for 295 miles through Arkansas’s Delta region before emptying into the Mississippi River. The river passes multiple lakes created by eight USACE dams. Six lakes are operated together as a system to reduce the frequency and severity of floods.

Between 1900 and 1908, USACE built the three timber-crib and concrete dams and locks associated with the Projects. The locks were used for navigation, moving boats containing shipments of timber, cotton, and mining products such as limestone and silica. By the mid-1950s, trains had replaced boats as the primary method for transporting these products. USACE decommissioned the locks and sold the properties. Development of the new hydropower capacity involved a utility, a college, a city, a county, the U.S. Congress, 27 years, a myriad of engineers and lawyers, and lots of tenacity and perseverance by a dedicated group of individuals. Project construction began in 2003 and the Projects came online in 2006-2007. LD3 is the most upstream of the three Projects located in Stone County, AR at river mile 320.2.

LD3 includes a concrete and crèche en bois barrage approximately 750 feet long and 21feet high with a 3-foot-high concrete cap added in 2010 that raised the dam height to a déversoir crest elevation of 275.5 feet (NGVD).

The dam creates an impoundment with a surface area of 787 acres. The centrale contains a single vertical Kaplan turbine and generating unit rated at 4.3 MW with a design flow of 3,163 cubic feet per second (cfs). The average annual generation is approximately18,700 MWh. An open-buse tailrace returns flow to the river 300 feet downstream of the dam. The Project boundary encompasses the high-water mark and about 42 acres of land around Project structures.

Le projet est exploité de manière instantanée au fil de l'eau mode. Inflows for LD1, LD2 and LD3 are dependent on the outflow from the upstream USACE dams at Bull Shoals on the White River and from Norfolk Lake on the North Fork River along with other tributaries. There are no spillway portes à aucun des barrages. Les capacités de débit des usines sont faibles par rapport au débit du fleuve et les niveaux de retenue descendent rarement au-dessus ou en dessous du niveau maximal. déversoirs. Au fil de l'eau le fonctionnement et les débits sont surveillés sur la base de la jauge USGS le long de la rivière White à Batesville, AR.

Les eaux à portée des trois installations sont répertoriées comme favorisant la propagation des poissons et de la faune, les ressources primaires et loisirs de contact secondaire, ainsi que pour l'approvisionnement en eau domestique, agricole et industrielle. Une surveillance de la qualité de l'eau a été menée de 2014 à 2019 afin de garantir que les installations n'avaient pas d'impact négatif sur l'oxygène dissous et la température de l'eau dans le secteur du projet.

La construction originale des installations d'écluse et de barrage comprenait passage des poissons échelles ou passes à poissons. Cependant, il ne reste actuellement que des vestiges de ces installations. Des débits élevés et des inondations dans la zone du projet anéantiraient certainement toute tentative d'aménager un passage permanent pour les poissons. La Commission de la pêche et de la chasse de l'Arkansas et le maître d'ouvrage ont pris contact pour discuter de la possibilité d'aménager des passages saisonniers pour les poissons, mais aucune recommandation ni prescription officielle n'a été fournie. Les espèces de poissons résidentes comprennent la truite arc-en-ciel et la truite fardée (ensemencées chaque année dans le lac Bull Shoals), le crapet, l'achigan noir, l'achigan blanc, le poisson-chat, l'omble de fontaine, l'alose et le doré jaune. La truite n'est pas indigène à l'Arkansas, mais il a été constaté que la pêche est due au rejet d'eau froide des barrages de l'USACE le long de la rivière White.

The project lands consist of roughly 42 acres. The property surrounding LD3 are primarily undeveloped forested and agricultural lands. An Erosion and Sedimentation Control Plan, Wildlife/Vegetation Management Plan and Zone humide/Plaine inondable Le plan de gestion et le plan de protection des rapaces ont été mis en œuvre dans le cadre des projets. Ces plans ont été examinés par l'US Fish and Wildlife Service (USFWS) et l'AGFC, sans aucun commentaire.

Les espèces menacées et en voie de disparition potentiellement présentes dans la zone du projet comprennent le vespertilion nordique, la chauve-souris de l'Indiana, la chauve-souris grise, le râle noir de l'Est, le pluvier siffleur, le bécasseau maubèche, le hellebender des Ozarks, le vespertilion du Missouri et le trèfle bison. Aucun habitat essentiel pour ces espèces n'est présent dans la zone du projet et les opérations du projet n'ont aucun impact sur elles.

Les écluses et les barrages ont été jugés éligibles à l'inscription sur la liste Registre national des lieux historiques and construction of the hydroelectric stations would require removal of portions of the existing lock and dam structures. At that time, the Arkansas State Historic Preservation Officer (SHPO) noted this would constitute an adverse impact on the eligible properties and recommended documentation of the projects prior to demolition. LD3 required coordination with the Arkansas SHPO to record all or part of the Lock and Dam No. 3, construct a scale map to show the relation of the lock and dam to other historic complexes on the White River. The project owner complied and produced such materials for the historical record.

Recreational resources at the project are limited due to lack of access points to the river. Some boating occurs upstream and downstream of the project. Public access is provided free of charge where safe.


État de conformité

Le certificat comprend les conditions spécifiques à l'établissement suivantes :

Condition 1 : Si le propriétaire de l'installation reçoit une notification pendant la durée de cette certification LIHI de l'USFWS ou de l'AGFC indiquant que le passage en amont et/ou en aval pour les poissons anadromes ou catadrome Si du poisson est requis dans l'une des installations, le propriétaire doit transmettre à LIHI une copie de cette notification ainsi qu'un résumé des plans et un calendrier pour lancer la consultation et mettre en œuvre le passage ; et doit fournir une mise à jour de l'état d'avancement de la mise en œuvre dans les déclarations de conformité annuelles.

Condition 2 (facultatif) : si, à tout moment avant six mois avant l'expiration des conditions de certification pour chaque projet, le propriétaire met volontairement en œuvre un passage saisonnier des anguilles en amont dans un ou plusieurs des projets en l'absence d'une recommandation de l'agence dans la condition 1, LIHI examinera ces informations et déterminera s'il convient ou non d'attribuer une norme PLUS et de prolonger la durée du certificat de trois années supplémentaires.

2025: Aucun changement important ni problème de conformité n'a été identifié. Le projet demeure conforme suite à l'examen annuel. Aucun changement d'état n'a été signalé.

2024: Aucun changement important ni problème de conformité n'a été identifié. Le projet demeure conforme suite à l'examen annuel. Aucun changement d'état n'a été signalé.

2023: Aucun changement important ni problème de conformité n'a été identifié. Le projet demeure conforme suite à l'examen annuel. Aucun changement d'état n'a été signalé.

2022: Aucun changement important ni problème de conformité n'a été identifié. Le projet demeure conforme suite à l'examen annuel. Aucun changement d'état n'a été signalé.

2021: Le rapport annuel pour le certificat actuel n’est pas encore entré en vigueur.


Historique des certifications

1er janvier 2022 : La durée du certificat LIHI a été prolongée conformément à la révision 2.05 du manuel de certification LIHI 2e édition publié le 1er janvier 2022. Reportez-vous au tableau des établissements ci-dessus pour connaître la nouvelle durée.

3 août 2021 : The Low Impact Hydropower Institute has issued a final decision on the certification of the White River Lock and Dam No. 3 Project located on the White River in Arkansas. The 30-day appeal window closed on July 31, 2021 and no appeals were filed. Therefore, the decision to certify the project is now final. The new term is June 9, 2021 through June 8, 2026.

1er juillet 2021 : Le Low Impact Hydropower Institute (LIHI) a approuvé la certification à faible impact (LIHI #179, #180, #181) pour les projets hydroélectriques n° 1, n° 2 et n° 3 de l'écluse et du barrage de White River, situés sur la rivière White, en Arkansas. Cette décision est provisoire, dans l'attente d'un délai d'appel de 30 jours. Seuls les participants ayant commenté la demande initiale pendant ce délai de 60 jours sont autorisés à déposer un recours. Ce recours doit inclure une explication expliquant en quoi le projet ne répond pas aux critères du LIHI. Les demandes de recours peuvent être soumises par courriel à l'adresse suivante : commentaires@lowimpacthydro.org avec « White River Project » en objet, ou par courrier adressé au Low Impact Hydropower Institute, 1167 Massachusetts Ave, Arlington, MA 02476. Toutes les demandes seront publiées sur le site web. Le demandeur aura la possibilité de répondre, et toute réponse sera également publiée. Les demandes doivent être reçues avant 17 h, heure de l’Est, le 31 juillet 2021. Le dossier complet et le rapport d'évaluation sont disponibles ci-dessous. En l'absence de recours, la période de certification pour chaque projet sera du 9 juin 2021 au 8 juin 2026, sauf prolongation conformément à la condition 2.

27 avril 2021 : Le Low Impact Hydropower Institute a reçu une demande complète de certification à faible impact pour le projet hydroélectrique de White River. Le LIHI sollicite les commentaires du public sur cette demande. Plus précisément, nous souhaitons savoir si, selon vous, le projet répond aux critères de certification à faible impact du LIHI, tels que révisés dans la 2e édition du manuel. Veuillez consulter le programme et les critères dans la version révisée du LIHI. Manuel et consultez ensuite les documents de candidature du projet ci-dessous. Les commentaires directement liés à des critères spécifiques du LIHI (débits, qualité de l'eau, passage des poissons, etc.) seront les plus utiles, mais tous les commentaires seront pris en compte. Les commentaires peuvent être soumis à l'Institut par courrier électronique à l'adresse commentaires@lowimpacthydro.org avec « Commentaires sur le projet White River » dans la ligne d'objet, ou par courrier adressé au Low Impact Hydropower Institute, 1167 Massachusetts Avenue, Arlington, MA 02476. Les commentaires doivent être reçus au plus tard à 17 h, heure de l'Est, le 26 juin 2021. à prendre en considération. Tous les commentaires seront publiés sur le site Web et le candidat aura la possibilité d'y répondre. Toute réponse sera également publiée.


Dossiers de certification

Certification 2021


Documents clés