Preliminary Decision – Recertification of Woronoco Project, LIHI #68
juin 3, 2020
Preliminary Decision – Certification of the Cataract Project, Pending LIHI #169
juin 22, 2020Lexington MA (June 18, 2020): The Low Impact Hydropower Institute (LIHI) has preliminarily approved the Farmers Irrigation District Project (LIHI #45) for a new 5-year term of Low Impact Certification. The Certificate includes the following condition:
Condition 1 : The facility Owner shall continue to operate the Project in accordance with the 2019 Memorandum of Agreement (MOA) with ODFW and ODEQ and provide status updates to LIHI in annual compliance statements. Updates should specify if operations are modified as a result of the adaptive management program, or if the MOA is revised during the LIHI term.
Cette décision est préliminaire en attendant la période d'appel de 30 jours. Seuls ceux qui ont commenté la demande initiale pendant la période de commentaires de 60 jours sont éligibles pour déposer un appel. Un tel appel doit inclure une explication sur la raison pour laquelle le projet ne répond pas aux critères du LIHI. Les demandes d'appel peuvent être soumises par courrier électronique à commentaires@lowimpacthydro.org with “Farmers Irrigation District Project” in the subject line, or by mail addressed to the Low Impact Hydropower Institute, 329 Massachusetts Ave, Suite 6, Lexington, MA 02420. All requests will be posted to the website. The applicant will have an opportunity to respond and any response will also be posted. Les demandes doivent être reçues avant 17 heures, heure de l'Est, le 18 juillet 2020.. La demande complète et le rapport de l'examinateur sont disponibles ICI.
If no appeal requests are received and the decision becomes final, the Certification term for the Project will be March 25, 2019 through March 24, 2029.
Projet North Umpqua, LIHI #69 OR – Demande de recertification complète reçue
En savoir plus