
Woronoco, LIHI #68 – Complete Application Received
febrero 24, 2020
Decisión final: recertificación del proyecto Winooski One/Chace Mill, LIHI #16
26 de febrero de 2020Lexington MA (February 25, 2020): The Low Impact Hydropower Institute (LIHI) has received a complete recertification application from Ware River Power, Inc. for the Ware River Project located on the Ware River in Ware, Massachusetts. The complete application can be found AQUÍ.
LIHI is seeking comment on this application. Comments that are directly tied to specific LIHI criteria (flows, water quality, paso de peces, etc.) will be most helpful, but all comments will be considered. Comments may be submitted to the Institute by e-mail at comentarios@lowimpacthydro.org con “Comentarios sobre el Proyecto Ware River” en la línea de asunto, o por correo dirigido al Low Impact Hydropower Institute, 329 Massachusetts Avenue, Suite 6, Lexington, MA 02420. Los comentarios deben recibirse en el Instituto antes de las 5:00 p. m., hora del Este, el 25 de abril de 2020. to be considered. All comments will be posted to the web site and the applicant will have an opportunity to respond. Any response will also be posted.
Proyecto North Umpqua, LIHI #69 OR – Solicitud de recertificación completa recibida
Leer más