LIHI Certificate #184 - Narrows Road Pressure Reduction Valve Station Project, Massachusetts

Nombre del proyecto Narrows Road Pressure Reduction Valve Station Project
Certificado LIHI No. 184
Plazo del certificado LIHI
June 25, 2021 – June 24, 2036
Dueño City of Fitchburg, MA
Estado Massachusetts
Ubicación Located in the Nashua River Watershed in the town of Fitchburg, Massachusetts.
Capacidad instalada 0.010 MW
Generación media anual 65.37 MWh
Tipo de instalación Conducto
Comisión Federal de Comercio No. CD18-3, Qualified Conduit Exención, 2018

The Narrows Road Pressure Reduction Valve Station is a conduit facility that is located in the City of Fitchburg and is situated between the Falulah Regional Water Treatment Facility and the City of Fitchburg water distribution system. At no point does this facility directly receive from surface waters and is considered a closed water system.

The water within the facility does not affect the water quality below, around, or above the facility. The water flows from the Falulah Water Treatment Facility, passes through the facility, and then continues to flow into the City of Fitchburg distribution system.

Historically, the Water Treatment Facility receives water from numerous reservoirs including the Falulah, Lovell, Ashby, and Bickford reservoirs. After consultation with the Massachusetts Division of Fisheries and Wildlife, there are no anticipated impacts on migratory fish species that pertain to the Narrows Road facility.

A large variety of fish can be found in the reservoirs listed above including: rainbow trout, largemouth bass, smallmouth bass, chain pickerel, and yellow perch.

The site consists of a small brick instrumentation house, and the adjacent concrete pump vault station which houses the hydro turbine, located along Narrows Road, Westminster MA. Therefore, there are no impacts to shoreline or watersheds.

Based on correspondence with the Massachusetts Division of Fisheries and Wildlife, the Division determined that the project does not occur within Estimated Habitat of Rare Wildlife or Priority Habitat as indicated in the Massachusetts Natural Heritage Atlas. Upon review of the US Fish and Wildlife Service IPaC report for federally-listed species, all of Massachusetts is considered roosting territory for the Northern Long Eared Bat. However, there are no trees located around the pump station that could be considered roosting trees, and this project is situated inside the pump station vault.

This very small project site is located on land that is owned and operated by the City of Fitchburg. There are no known cultural or historic resources located on the property. No digging or land disturbance was performed during construction, and all work occurred within the pre-existing pump vault.

The facility is a secure and locked area, with no opportunities for public access. While the surrounding parcel may be used for recreational opportunities by neighbors, access to the facility is strictly controlled as it is a critical piece of infrastructure for the City of Fitchburg.


Estado de cumplimiento

No existen condiciones específicas de la instalación en el Certificado actual

2024: No se identificaron cambios materiales ni problemas de cumplimiento. El proyecto sigue cumpliendo con los requisitos según la revisión anual.

2023: No se identificaron cambios materiales ni problemas de cumplimiento. El proyecto sigue cumpliendo con los requisitos según la revisión anual.

2022: No se identificaron cambios materiales ni problemas de cumplimiento. El proyecto sigue cumpliendo con los requisitos según la revisión anual.

2021: La presentación de informes anuales para el Certificado actual aún no ha entrado en vigor.


Historial de certificaciones

1 de enero de 2022: El plazo del Certificado LIHI se ha extendido de acuerdo con la Revisión 2.05 del Manual de Certificación LIHI 2.ª Edición emitido el 1 de enero de 2022. Consulte la tabla de instalaciones anterior para conocer el nuevo plazo.

October 25, 2021: The Low Impact Hydropower Institute has issued a final decision on the certification of the Narrows Road Pressure Reduction Valve Station Project . The 30-day appeal window closed on October 2, 2021 and no appeals were filed. Therefore, the decision to certify the project is now final. The certificate term is June 25, 2021 through June 24, 2031.

2 de septiembre de 2021: The Low Impact Hydropower Institute (LIHI) has preliminarily approved the Narrows Road PRV Project for a 10-year term of Low Impact Certification. This decision is preliminary pending the 30-day appeal window. Only those who commented on the initial application during the 60-day comment period are eligible to file an appeal. Such appeal needs to include an explanation as to how the Project does not meet the LIHI criteria. Appeal requests can be submitted by email to comentarios@lowimpacthydro.org with “Narrows Road PRV Project” in the subject line, or by mail addressed to the Low Impact Hydropower Institute, 1167 Massachusetts Ave, Office 407, Arlington, MA 02476. All requests will be posted to the website. The applicant will have an opportunity to respond and any response will also be posted. Requests must be received by 5 pm Eastern time on October 2, 2021. The full application and reviewer’s report are available below. If no appeal requests are received and the decision becomes final, the Certification term for the Project will be June 25, 2021 through June 24, 2031.

June 28, 2021:The Low Impact Hydropower Institute has received a complete application for Low Impact Certification of the Narrows Road Project. LIHI is seeking public comment on this application. Specifically, we are interested in knowing whether you think the Project meets the LIHI Low Impact Certification Criteria, as revised in the 2nd Edition Handbook. Please review the program and criteria in LIHI’s revised Manual y luego revise los materiales de solicitud del Proyecto a continuación. Comentarios que están directamente relacionados con criterios específicos de LIHI (caudales, calidad del agua, paso de peces, etc.) serán de gran ayuda, pero se tendrán en cuenta todos los comentarios. Los comentarios pueden enviarse al Instituto por correo electrónico a comentarios@lowimpacthydro.org with “Narrows Road Project Comments” in the subject line, or by mail addressed to the Low Impact Hydropower Institute, 1167 Massachusetts Avenue, Arlington, MA 02476. Los comentarios deben recibirse antes de las 5 p. m., hora del Este, el August 27, 2021 Para ser considerado. Todos los comentarios se publicarán en el sitio web y el solicitante tendrá la oportunidad de responder. Las respuestas también se publicarán.


Archivos de certificación

Certificación 2021


Documentos clave