LIHI Certificate #181 – White River Lock and Dam No. 3 Project, Arkansas

Nombre del proyecto Esclusa del río Blanco y Presa No. 3
Certificado LIHI No. 181
Plazo del certificado LIHI 9 de junio de 2021 – 8 de junio de 2031 (opción de prórroga hasta el 8 de junio de 2034)
Dueño Independence County, AR
Estado Arkansas
Ubicación River mile 320.2 on the White River
Capacidad instalada 4,3 MW
Generación media anual 18,764 MWh
Tipo de instalación Flujo de río
Comisión Federal de Comercio No. P-4659, issued in 1986, expires 01/31/2036.

White River Lock and Dam No. 1 (LIHI #179), Esclusa y presa n.º 2 (LIHI #180), and the “Shelby M. Knight” Lock and Dam No. 3 Hydroelectric Projects (LD1, LD2, LD3) collectively known as the “White River Hydroelectric Project”, are located on the White River in north central Arkansas. The river begins in northwestern Arkansas in the Boston Mountains and flows east toward Fayetteville where it then turns north. The river enters Missouri near Eureka Springs. It then flows southeast back into Arkansas past Bull Shoals, Mountain Home, and Calico Rock. At Batesville, the second section of the river, known as the Lower White, begins. From Batesville, the river flows south for 295 miles through Arkansas’s Delta region before emptying into the Mississippi River. The river passes multiple lakes created by eight USACE dams. Six lakes are operated together as a system to reduce the frequency and severity of floods.

Between 1900 and 1908, USACE built the three timber-crib and concrete dams and locks associated with the Projects. The locks were used for navigation, moving boats containing shipments of timber, cotton, and mining products such as limestone and silica. By the mid-1950s, trains had replaced boats as the primary method for transporting these products. USACE decommissioned the locks and sold the properties. Development of the new hydropower capacity involved a utility, a college, a city, a county, the U.S. Congress, 27 years, a myriad of engineers and lawyers, and lots of tenacity and perseverance by a dedicated group of individuals. Project construction began in 2003 and the Projects came online in 2006-2007. LD3 is the most upstream of the three Projects located in Stone County, AR at river mile 320.2.

LD3 includes a concrete and cuna de madera presa approximately 750 feet long and 21feet high with a 3-foot-high concrete cap added in 2010 that raised the dam height to a aliviadero crest elevation of 275.5 feet (Vehículo motorizado nacional).

The dam creates an impoundment with a surface area of 787 acres. The central eléctrica contains a single vertical Kaplan turbine and generating unit rated at 4.3 MW with a design flow of 3,163 cubic feet per second (cfs). The average annual generation is approximately18,700 MWh. An open-canal artificial tailrace returns flow to the river 300 feet downstream of the dam. The Project boundary encompasses the high-water mark and about 42 acres of land around Project structures.

The Project is operated in an instantaneous de pasada mode. Inflows for LD1, LD2 and LD3 are dependent on the outflow from the upstream USACE dams at Bull Shoals on the White River and from Norfolk Lake on the North Fork River along with other tributaries. There are no spillway puertas en cualquiera de las presas. Las capacidades de caudal de las plantas son bajas en comparación con el caudal del río y los niveles de los embalses rara vez descienden hasta el límite superior o por debajo de él. aliviaderos. De pasada La operación y los flujos se monitorean según el medidor USGS a lo largo del río Blanco en Batesville, AR.

Las aguas en el alcance de las tres instalaciones están catalogadas como propicias para la propagación de peces y vida silvestre, primaria y recreación de contacto secundario, y para usos domésticos, agrícolas e industriales. Se realizó un monitoreo de la calidad del agua entre 2014 y 2019 para garantizar que las instalaciones no afectaran negativamente el oxígeno disuelto y la temperatura del agua en el área del proyecto.

La construcción original de las instalaciones de la esclusa y la presa incluía paso de peces escaleras o escalas para peces. However, only remnants of these facilities currently remain. High flows and flooding in the project area would certainly destroy any attempt to provide permanent fish passage at the projects. Arkansas Fish and Game Commission and the project owner have been in contact to discuss the potential for seasonal fish passage structures though no formal recommendations or prescriptions have been provided. Resident fish species include rainbow and cutthroat trout, (stocked annually in the Bull Shoals Lake) crappie, black bass, white bass, catfish, brook trout, shad, and walleye. Trout are not native to Arkansas, but the fisheries have been noted to be a result of the cold water discharge from the USACE dams along the White River.

The project lands consist of roughly 42 acres. The property surrounding LD3 are primarily undeveloped forested and agricultural lands. An Erosion and Sedimentation Control Plan, Wildlife/Vegetation Management Plan and Humedal/Llanura de inundación En los proyectos se implementaron planes de gestión y de protección de aves rapaces. El Servicio de Pesca y Vida Silvestre de Estados Unidos (USFWS) y la AGFC revisaron los planes sin comentarios.

Threatened and endangered species potentially present in the project area includes Northern long-eared bat, Indiana bat, gray bat, Eastern black rail, piping plover, red knot, Ozark hellbender, Missouri bladderpod, and running buffalo clover. No critical habitats for these species are present in the project area and project operations do not impact them.

Se determinó que las esclusas y represas eran elegibles para ser incluidas en la lista Registro Nacional de Lugares Históricos and construction of the hydroelectric stations would require removal of portions of the existing lock and dam structures. At that time, the Arkansas State Historic Preservation Officer (SHPO) noted this would constitute an adverse impact on the eligible properties and recommended documentation of the projects prior to demolition. LD3 required coordination with the Arkansas SHPO to record all or part of the Lock and Dam No. 3, construct a scale map to show the relation of the lock and dam to other historic complexes on the White River. The project owner complied and produced such materials for the historical record.

Recreational resources at the project are limited due to lack of access points to the river. Some boating occurs upstream and downstream of the project. Public access is provided free of charge where safe.


Estado de cumplimiento

El Certificado incluye las siguientes condiciones específicas de la instalación:

Condición 1: Si el Propietario de la instalación recibe una notificación durante el plazo de esta Certificación LIHI de USFWS o AGFC de que el paso ascendente y/o descendente para organismos anádromos o catádromo Si se requiere pescado en cualquiera de las instalaciones, el Propietario deberá enviar a LIHI una copia de esa notificación junto con un resumen de los planes y un cronograma para iniciar la consulta e implementar la aprobación; y deberá proporcionar una actualización del estado del progreso de la implementación en las declaraciones de cumplimiento anuales.

Condición 2 (opcional): Si en cualquier momento antes de los seis meses previos al vencimiento de los términos de la Certificación para cada Proyecto, el Propietario implementa voluntariamente el paso estacional de anguilas río arriba en uno o más de los Proyectos en ausencia de una recomendación de la agencia en la Condición 1, LIHI revisará esa información y determinará si otorgará o no un estándar PLUS y extenderá el plazo del Certificado por tres años adicionales.

2024: No se identificaron cambios materiales ni problemas de cumplimiento. El proyecto sigue cumpliendo con los requisitos según la revisión anual. El proyecto no informó cambios en su estado de conservación.

2023: No se identificaron cambios materiales ni problemas de cumplimiento. El proyecto sigue cumpliendo con los requisitos según la revisión anual. El proyecto no informó cambios en su estado de conservación.

2022: No se identificaron cambios materiales ni problemas de cumplimiento. El proyecto sigue cumpliendo con los requisitos según la revisión anual. El proyecto no informó cambios en su estado de conservación.

2021: La presentación de informes anuales para el Certificado actual aún no ha entrado en vigor.


Historial de certificaciones

1 de enero de 2022: El plazo del Certificado LIHI se ha extendido de acuerdo con la Revisión 2.05 del Manual de Certificación LIHI 2.ª Edición emitido el 1 de enero de 2022. Consulte la tabla de instalaciones anterior para conocer el nuevo plazo.

3 de agosto de 2021: The Low Impact Hydropower Institute has issued a final decision on the certification of the White River Lock and Dam No. 3 Project located on the White River in Arkansas. The 30-day appeal window closed on July 31, 2021 and no appeals were filed. Therefore, the decision to certify the project is now final. The new term is June 9, 2021 through June 8, 2026.

1 de julio de 2021: El Instituto de Energía Hidroeléctrica de Bajo Impacto (LIHI, por sus siglas en inglés) ha aprobado preliminarmente la Certificación de Bajo Impacto (pendiente LIHI #179, #180, #181) para los Proyectos Hidroeléctricos de Esclusas y Presas N.° 1, N.° 2 y N.° 3 del Río Blanco ubicados en el Río Blanco en Arkansas. Esta decisión es preliminar a la espera del período de apelación de 30 días. Solo aquellos que comentaron sobre la solicitud inicial durante el período de comentarios de 60 días son elegibles para presentar una apelación. Dicha apelación debe incluir una explicación de por qué el Proyecto no cumple con los criterios del LIHI. Las solicitudes de apelación se pueden enviar por correo electrónico a comentarios@lowimpacthydro.org con “White River Project” en la línea de asunto, o por correo dirigido al Low Impact Hydropower Institute, 1167 Massachusetts Ave, Arlington MA 02476. Todas las solicitudes se publicarán en el sitio web. El solicitante tendrá la oportunidad de responder y cualquier respuesta también se publicará. Las solicitudes deben recibirse antes de las 5 p. m., hora del Este, del 31 de julio de 2021. La solicitud completa y el informe de revisión están disponibles a continuación. Si no se reciben solicitudes de apelación, los plazos de certificación para cada proyecto serán del 9 de junio de 2021 al 8 de junio de 2026, a menos que se extiendan según la Condición 2.

27 de abril de 2021: El Instituto de Energía Hidroeléctrica de Bajo Impacto ha recibido una solicitud completa para la Certificación de Bajo Impacto del Proyecto Hidroeléctrico White River. LIHI está buscando comentarios públicos sobre esta solicitud. Específicamente, nos interesa saber si usted cree que el Proyecto cumple con los Criterios de Certificación de Bajo Impacto de LIHI, según se revisaron en el Manual de la 2.ª Edición. Revise el programa y los criterios en el Manual revisado de LIHI. Manual y luego revise los materiales de solicitud del Proyecto a continuación. Los comentarios que estén directamente relacionados con criterios específicos de LIHI (flujos, calidad del agua, paso de peces, etc.) serán de gran ayuda, pero se considerarán todos los comentarios. Los comentarios pueden enviarse al Instituto por correo electrónico a comentarios@lowimpacthydro.org con “Comentarios del Proyecto White River” en la línea de asunto, o por correo dirigido al Low Impact Hydropower Institute, 1167 Massachusetts Avenue, Arlington, MA 02476. Los comentarios deben recibirse antes de las 5:00 p. m., hora del Este, el 26 de junio de 2021. Se considerarán todos los comentarios. Se publicarán en el sitio web y el solicitante tendrá la oportunidad de responder. También se publicarán todas las respuestas.


Archivos de certificación

Certificación 2021


Documentos clave