
Proposal – New Recertification Process
10 月 28, 2020
West Branch St. Regis 項目,LIHI #27 – 已收到完整申請
2020 年 10 月 30 日Lexington MA (October 30, 2020): The Low Impact Hydropower Institute (LIHI) has preliminarily approved recertification of the Crocker 壩 Project (LIHI #127) for a new 5-year term of Low Impact Certification. The Project is located on the Whitman River in Massachusetts.
This decision is preliminary pending the 30-day appeal window. Only those who commented on the initial application during the 60-day comment period are eligible to file an appeal. Such appeal needs to include an explanation as to how the Project does not meet the LIHI criteria. Appeal requests can be submitted by email to 評論@lowimpactHydro.org 主題行為“克羅克大壩計畫”,或郵寄至低影響水力發電研究所,地址為:329 Massachusetts Ave, Suite 6, Lexington, MA 02420。申請人將有機會回應,任何回應也將公佈。 請求必須在 2020 年 11 月 29 日東部時間下午 5 點之前收到。 完整的申請和審稿人報告可供使用 這裡。
If no appeal requests are received and the decision becomes final, the Certification term for the Project will be September 15, 2020 through September 14, 2025.
北安普誇項目,LIHI #69 OR – 已收到完整的重新認證申請
閱讀更多