LIHI Certificate #8 - Nisqually Project, Washington

項目名稱 Nisqually
理海證書編號 8
LIHI 證書期限 April 15, 2018 – April 14, 2028
擁有者 City of Tacoma
狀態 華盛頓
地點 Located between river mile 42.5 and 44.2 on the Nisqually River in Pierce, Thurston, and Lewis Counties, Washington.
裝置容量 Total: 116.6 MW
Alder: 52.6 MW
LaGrande: 64 MW
平均年發電量 Total: 530,851 MWh

Alder: 202,660 MWh
LaGrande: 328,191 MWh

設施類型 LaGrande: 徑流
Alder: 尖峰
聯邦能源監管委員會 不。 P-1862 issued in 1997, expires 02/28/2037

The Nisqually Project is located on the Nisqually River in southwestern Washington and operates across lands in three counties: Pierce, Thurston and Lewis. The Nisqually River originates from the Nisqually Glacier on Mount Rainer and flows approximately 80 miles west to Puget Sound. The project is partially located in the Mount Baker-Snoqualmie National Forest. The project is comprised of two facilities, the LaGrande development and the Alder development. The LaGrande development was completed and began operation in 1912 and the Alder Dam was completed and began operation in 1945.

The project owner maintains active engagement with state and federal agencies and the Nisqually Tribe, in the management of the Nisqually River. In 1978, the Nisqually River Coordinating Committee (NRCC) was formed. This committee is composed of the City of Centralia, the Nisqually Tribe, Washington Dept. of Fish and Wildlife (WDFW), National Marine Fisheries Service (NMFS), U.S. Fish and Wildlife Service (USFWS). The project owner consults regularly with the NRCC, as they continue to implement their current FERC license.

The project includes two hydroelectric facilities. Each facility includes a , reservoir, flowline, 發電站, and an associated power transmission switchyard.

The Alder facility includes a 285-foot-high concrete arch dam that impounds Alder Lake, a 7.4-mile-long storage reservoir with a maximum surface area of 3,065 acres. Adjacent to the main dam structure is a reinforced concrete 溢洪道 channel with a total discharge capacity of 80,000 cubic feet per second (cfs). The Alder powerhouse is located at the base of the dam. The powerhouse contains two generating units with an installed capacity of 52.6 MW.

The LaGrande facility consists of a 192-foot-high concrete 重力壩 impounding LaGrande reservoir, which has a surface area of 45 acres. The LaGrande reservoir is situated in a deep, precipitous canyon, extending a distance of 1.5 miles to the base of Alder dam. LaGrande Dam has a large reinforced concrete spillway with an 80,000-cfs capacity.

The dam diverts flows into a 6,400-foot-long underground tunnel, which terminates at a steel 壓力水管 leading to a manifold structure serving five individual 壓力管道 for each of five generating units in the LaGrande powerhouse. The total installed capacity is 64 MW. The 1.7-mile-long LaGrande bypassed reach is situated in a deep gorge between LaGrande Dam and the LaGrande powerhouse.

The project developments operate in separate modes. The Alder facility operates as a 達到峰值 project and the LaGrande facility operates in a 徑流 mode, passing all inflow from the Alder impoundment. The Alder facility also provides storage to support late summer critical flows in the downstream reaches. Additionally, flows from the LaGrande facility augment water temperatures to support salmonids in the downstream reach by pulling cold water from deep in the LaGrande impoundment. The project provides flows of 30 cfs continuously into the bypassed reach to enhance salmonid rearing and spawning habitat. This flow regime was developed by the NRCC to enhance river flows and aquatic habitat.

Waters within the project reach are designated supportive of all aquatic life uses, primary contact recreation, water supply, and aesthetics. The mouth of the Nisqually River is listed as impaired for increased water temperatures. The Washington Department of Ecology has concluded that the project does not contribute to the impairment as the deep impoundments help supply cool water to the downstream impaired reaches. Even in a low snowpack year, the project is able to mitigate increased water temperature concerns via cool-water releases from the Alder impoundment. This provides suitable habitat for salmonids and other aquatic species that otherwise may be impacted by increased water temperature. This mitigation was dictated by the NRCC which met frequently during 2015-2016 to ensure proper water quality stewardship.

Historically, several natural barriers in the river have prevented upstream passage access for migratory fish species. These barriers are primarily natural falls and cascades that preclude access to the upstream reaches of the project. Surveys conducted by WDFW and the NRCC concluded that limited suitable habitat along with natural barriers limit the need for upstream passage facilities. Similarly, downstream passage is blocked by natural barriers and separate fish populations occur upstream and downstream of the project. Species found downstream of the project are supported by increased flows from the project and temperature mitigation measures discussed above further support fish populations and habitat. Downstream species include Chinook, coho, and pink salmon, steelhead/rainbow trout, and cutthroat trout. Species found in the Alder impoundment include kokanee, rainbow trout, cutthroat trout, largemouth and smallmouth bass, yellow perch, black and white crappie, and channel catfish.

The project lands consist of roughly 7,600 acres. The includes more than 3,350 acres acquired and reserved by the project owner-designated the Nisqually Wildlife Management Area. A wildlife management plan was developed in consultation with WDFW, USFWS, and the Nisqually Tribe to protect, mitigate, and enhance the shoreline around the project. The plan includes descriptions of land parcels in the management area, prescriptions for management of wildlife habitat, monitoring and evaluating the effectiveness of the measures, and a schedule for revising the plan and implementing its measures. Each year the project owner prepares an annual report which contains the status of the plan measures and activities that occurred during the previous year. The project owner partners with the South Puget Sound Salmon Enhancement Group and the Nisqually Indian Tribe to provide large woody debris (LWD) from reservoir clean-out operations free of charge for restoration projects on the Mashel River and Ohop Creek, two important salmon-bearing tributaries to the lower Nisqually downstream of the project. The project owner also partners with the Nisqually Indian Tribe by funding conifer plantings on 87 acres of 河岸 habitat on the wildlife lands. Plantings cover approximately 15 acres per year for six years. The plantings are intended to be a future source of LWD recruitment into the Nisqually River to help maintain and improve fish habitat. While they grow and mature, these conifer understory plantings also increase habitat diversity that provides a long-term benefit to a variety of terrestrial species.

Threatened or endangered species potentially present in the project vicinity include the Chinook salmon, steelhead trout, gray wolf, grizzly bear, Northern spotted owl, and marbled murrelet. The only species found in the project area are the Chinook salmon and steelhead trout. No other listed species have been observed in or near the project area though all suitable terrestrial habitat is protected under the project’s wildlife management plan noted above. The project provides minimum flows to support downstream salmonid habitat and supplies LWD for use in restoration projects in the Nisqually River tributaries.

The project owner has consulted with the State Historic Preservation Office (SHPO) to determine if any cultural or historic resources may be found in the project area. The SHPO has concluded that no known prehistoric cultural resource sites, historic buildings, or structures are currently present on project lands. The project owner consults with the SHPO prior to conducting any ground disturbing activities.

Recreational resources at the project include non-motorized access on the Alder impoundment. Kokanee stocking occurs in the impoundment for recreational purposes and all formal recreational facilities occur in the Alder impoundment. The rest of the project areas are not easily accessed by the public due to their relative isolation and steep terrain. Public access is provided free of charge where safe.


合規狀態

目前證書中沒有針對設施的具體條件

2024: 未發現重大變更或合規問題。根據年度審查,該項目仍符合規定。

2023: 未發現重大變更或合規問題。根據年度審查,該項目仍符合規定。

2022: 未發現重大變更或合規問題。根據年度審查,該項目仍符合規定。

2021: 沒有報告變更或合規問題。根據年度審查,該項目仍符合規定。

2020: 沒有報告變更或合規問題。根據年度審查,該項目仍符合規定。

2019: 沒有報告變更或合規問題。根據年度審查,該項目仍符合規定。

2018: 目前證書的年度報告尚未生效。


認證歷史

2022 年 1 月 1 日: 根據 2022 年 1 月 1 日發布的 LIHI 第二版認證手冊第 2.05 版,LIHI 證書期限已延長。

2019年8月8日: The decision to recertify the Nisqually Hydroelectric Project is final. No appeals were received during the appeal period which closed on May 11, 2019. The certification term for the Project is from April 15, 2018 through April 14, 2023.

April 10, 2019: The Low Impact Hydropower Institute (LIHI) preliminarily approved Low Impact Certification for the Nisqually River Hydroelectric Project, LIHI Certificate #8 for a new 5-year term.

該決定是初步決定,需等待 30 天的上訴期。只有在 60 天的評論期內對初始申請發表評論的人才有資格提出上訴。此類上訴需要包括有關該項目為何不符合 LIHI 標準的解釋。申訴請求可以透過電子郵件發送至 評論@lowimpactHydro.org with “Nisqually Hydroelectric Project” in the subject line, or by mail addressed to the Low Impact Hydropower Institute, 329 Massachusetts Ave, Suite 6, Lexington, MA 02420. All requests will be posted to the website.  The applicant will have an opportunity to respond and any response will also be posted. Requests must be received by 5 pm Eastern time on May 11, 2019.  完整的申請和審閱者報告如下。

December 10, 2018: The Low Impact Hydropower Institute has received a complete application for Low Impact Re-certification of the Nisqually Hydroelectric Project.  LIHI is seeking public comment on this application.  Specifically, we are interested in knowing whether you think the Project meets the LIHI Low Impact Certification Criteria, as revised in the 2nd Edition Handbook.  Please review the program and criteria in LIHI’s revised 手冊 然後查看下面該項目的申請資料。與特定 LIHI 標準(流量、水質、 魚道等等)將非常有幫助,但所有評論都會被考慮。意見可以透過電子郵件提交給研究所 評論@lowimpactHydro.org with “Nisqually Project Comments” in the subject line, or by mail addressed to the Low Impact Hydropower Institute, 329 Massachusetts Avenue, Suite 2, Lexington, MA 02420.  Comments must be received on or before 5 pm Eastern time on February 8, 2019 予以考慮。所有評論都將發佈到網站上,申請人將有機會回應。任何回應也將被發布。

March 12, 2014: The City of Tacoma’s Nisqually River Hydroelectric Project has been recertified for a third five year term of low impact certification. The effective certification date is April 15, 2013 and it will expire April 15, 2018.

May 15, 2013: LIHI has received an application for recertification of the Nisqually River Hydroelectric Project. The application can be found below in the “Files” section.

2008年8月28日: The Nisqually River Hydroelectric Project has been recertified for a second five year term of low impact certification, as it continues to meet all of LIHI’s eight environmentally rigorous criteria addressing river flows, water quality, fish passage and protection, watershed health, endangered species protection, cultural resources, recreation use and access, and whether or not the dam itself was recommended for removal.

April 19, 2008: The Low Impact Hydropower Institute has received an application for recertification of the Nisqually River Hydroelectric Project, located on the Nisqually River in Washington.

September 17, 2003: The Nisqually River Hydroelectric Project has been certified as low impact for a five year term, effective April 15, 2003 and expiring April 15, 2008. It is the third hydropower facility to earn LIHI certification in Washington State, and the eighth nationwide.


認證文件

2018-2019 重新認證

2013 年重新認證

2008 年重新認證

2003 年認證


關鍵文件