LIHI Certificate #180 – White River Lock and Dam No. 2 Project, Arkansas

項目名稱 | 白河船閘和 壩 2號 |
理海證書編號 | 180 |
LIHI 證書期限 | 2021 年 6 月 9 日 – 2031 年 6 月 8 日(可選擇延長至 2034 年 6 月 8 日) |
擁有者 | Independence County, AR |
狀態 | 阿肯色州 |
地點 | River mile 308.3 on the White River |
裝置容量 | 3.9 MW |
平均年發電量 | 15,423 MWh |
設施類型 | 河流的奔流 |
聯邦能源監管委員會 不。 | P-4660, issued in 1985, expires 10/31/2035. |
White River Lock and Dam No. 1 (LIHI #179), Lock and Dam No. 2, and the 「Shelby M. Knight」 3 號船閘與大壩 (LIHI #181) (e.g., LD1, LD2, LD3) Hydroelectric Projects are collectively known as the “White River Hydroelectric Project”, are located on the White River in north central Arkansas. The river begins in northwestern Arkansas in the Boston Mountains and flows east toward Fayetteville where it then turns north. The river enters Missouri near Eureka Springs. It then flows southeast back into Arkansas past Bull Shoals, Mountain Home, and Calico Rock. At Batesville, the second section of the river, known as the Lower White, begins. From Batesville, the river flows south for 295 miles through Arkansas’s Delta region before emptying into the Mississippi River. The river passes multiple lakes created by eight USACE dams. Six lakes are operated together as a system to reduce the frequency and severity of floods.
Between 1900 and 1908, USACE built the three timber-crib and concrete dams and locks associated with the Projects. The locks were used for navigation, moving boats containing shipments of timber, cotton, and mining products such as limestone and silica. By the mid-1950s, trains had replaced boats as the primary method for transporting these products. USACE decommissioned the locks and sold the properties. Development of the new hydropower capacity involved a utility, a college, a city, a county, the U.S. Congress, 27 years, a myriad of engineers and lawyers, and lots of tenacity and perseverance by a dedicated group of individuals. Project construction began in 2003 and the Projects came online in 2006-2007. LD2 is located in Independence County, AR at river mile 308.3 between LD1 and LD3.
LD2 includes a concrete and 木製嬰兒床 壩 approximately 658 feet long and 29 feet high with an integral navigation lock approximately 175 feet long and 36 feet wide on the right side of the dam. A multi-level intake 水槽, approximately 120 feet long and 100 feet wide is located within the lock structure.
The dam creates an impoundment with a surface area of approximately 1,072 acres at maximum pool elevation. The 發電站 contains a single vertical Kaplan turbine and generating unit with a capacity of 3.9 MW and a design flow of 3,180 cfs. The average annual generation is approximately 15,400 MWh. An open flume tailrace, approximately 120 feet long conveys water back to the river. The Project boundary encompasses the high-water mark and about 10 acres of land around Project structures.
The Project is operated in an instantaneous 徑流 模式。 LD1、LD2 和 LD3 的流入量取決於懷特河布爾肖爾斯上游美國陸軍工程兵團水壩和北福克河諾福克湖以及其他支流的流出量。沒有 溢洪道 蓋茲 在任何一座水壩。與河流流量相比,工廠流量較低,蓄水水位很少下降到或低於 溢洪道. 徑流 根據阿肯色州貝茨維爾白河沿岸的美國地質調查局測量儀來監測運作和流量。
這三個設施所及水域被列為支持魚類和野生動物繁殖、主要和 二次接觸娛樂以及生活、農業和工業供水用途。 2014年至2019年進行了水質監測,以確保設施不會對工程河段的溶氧和水溫產生不利影響。
最初建造的船閘和水壩設施包括 魚道 梯子或 魚道. However, only remnants of these facilities currently remain. High flows and flooding in the project area would certainly destroy any attempt to provide permanent fish passage at the projects. Arkansas Fish and Game Commission and the project owner have been in contact to discuss the potential for seasonal fish passage structures though no formal recommendations or prescriptions have been provided. Resident fish species include rainbow and cutthroat trout, (stocked annually in the Bull Shoals Lake) crappie, black bass, white bass, catfish, brook trout, shad, and walleye. Trout are not native to Arkansas, but the fisheries have been noted to be a result of the cold water discharge from the USACE dams along the White River.
The project lands consist of roughly 10 acres. The property surrounding LD2 is primarily undeveloped forested and agricultural lands. An Erosion and Sedimentation Control Plan, Wildlife/Vegetation Management Plan and 濕地/洪氾區 管理計劃和猛禽保護計劃均已在專案中實施。美國魚類與野生動物管理局(USFWS)和 AGFC 審查了該計劃,但未發表任何意見。
Threatened and endangered species potentially present in the project area includes Northern long-eared bat, Indiana bat, gray bat, Eastern black rail, piping plover, red knot, Ozark hellbender, Missouri bladderpod, and running buffalo clover. No critical habitats for these species are present in the project area and project operations do not impact them.
這些船閘和水壩被確定為有資格列入 國家歷史遺跡名錄 and construction of the hydroelectric stations would require removal of portions of the existing lock and dam structures. At that time, the Arkansas State Historic Preservation Officer (SHPO) noted this would constitute an adverse impact on the eligible properties and recommended documentation of the projects prior to demolition. LD2 required coordination with the Arkansas SHPO to record all or part of the Lock and Dam No. 2, construct a scale map to show the relation of the lock and dam to other historic complexes on the White River. The project owner complied and produced such materials for the historical record.
Recreational resources at the project include boating access, informal camping areas, and fishing access downstream of the dam. The powerhouse and lock are fenced in for safety. Public access is provided free of charge where safety and private property do not preclude access.
合規狀態
此證書包括以下設施特定條件:
條件一: 如果設施所有者在本 LIHI 認證有效期內收到 USFWS 或 AGFC 的通知,要求其上游和/或下游通行溯河或 洄游性 如果任何設施需要捕魚,業主應將該通知的副本連同計劃摘要和啟動協商並實施通行的時間表轉發給 LIHI;並應在年度合規聲明中提供實施進展情況的最新情況。
條件 2(可選): 如果在每個專案的認證期限到期前六個月的任何時間,業主在條件 1 中沒有機構建議的情況下自願在一個或多個專案中實施季節性逆流鰻魚通行,LIHI 將審查該資訊並確定是否授予 PLUS 標準並將認證期限再延長三年。
2024: 未發現任何重大變更或合規問題。根據年度審查結果,該項目仍然合規。此項目報告狀況未有任何變化。
2023: 未發現任何重大變更或合規問題。根據年度審查結果,該項目仍然合規。此項目報告狀況未有任何變化。
2022: 未發現任何重大變更或合規問題。根據年度審查結果,該項目仍然合規。此項目報告狀況未有任何變化。
2021: 目前證書的年度報告尚未生效。
認證歷史
2022 年 1 月 1 日: 根據 2022 年 1 月 1 日發布的 LIHI 第二版認證手冊第 2.05 版,LIHI 證書期限已延長。
2021 年 8 月 3 日: The Low Impact Hydropower Institute has issued a final decision on the certification of the White River Lock and Dam No. 2 Project located on the White River in Arkansas. The 30-day appeal window closed on July 31, 2021 and no appeals were filed. Therefore, the decision to certify the project is now final. The new term is June 9, 2021 through June 8, 2026.
2021 年 7 月 1 日: 低影響水力發電研究所 (LIHI) 已初步批准對位於阿肯色州白河的白河船閘和大壩 1 號、2 號和 3 號水力發電項目進行低影響認證(待批 LIHI #179、#180、#181)。該決定是初步決定,需等待 30 天的上訴期。只有在 60 天的評論期內對初始申請發表評論的人才有資格提出上訴。此類上訴需要包括有關該項目為何不符合 LIHI 標準的解釋。申訴請求可以透過電子郵件發送至 評論@lowimpactHydro.org 主題行為“White River Project”,或郵寄至 Low Impact Hydropower Institute, 1167 Massachusetts Ave, Arlington MA 02476。申請人將有機會回應,任何回應也將公佈。 請求必須在 2021 年 7 月 31 日東部時間下午 5 點之前收到。 完整的申請和審查報告如下。如果沒有收到上訴請求,則每個項目的認證期限為 2021 年 6 月 9 日至 2026 年 6 月 8 日,除非根據條件 2 延長。
2021 年 4 月 27 日: 低影響水力發電研究所已收到白河水力發電計畫低影響認證的完整申請。 LIHI 正在就該申請徵求公眾意見。具體來說,我們想知道您是否認為該項目符合第二版手冊中修訂的 LIHI 低影響認證標準。請查看 LIHI 修訂版中的計劃和標準 手冊 然後審查下面的項目申請資料。與特定 LIHI 標準(流量、水質、魚通過等)直接相關的評論將是最有幫助的,但所有評論都會被考慮。意見可以透過電子郵件提交給研究所: 評論@lowimpactHydro.org 主題行為“White River 計畫評論”,或郵寄至低影響水力發電研究所,地址:1167 Massachusetts Avenue, Arlington, MA 02476。 評論必須在 2021 年 6 月 26 日東部時間下午 5 點或之前收到 予以考慮。所有評論都將發佈到網站上,申請人將有機會回應。任何回應也將被發布。