
Final Decision – Recertification of the Salmon River Project, LIHI #20
3 月 9, 2022
已收到完整申請 – 緬因州 Mattaceunk 項目
2022年3月30日March 23, 2022: The Low Impact Hydropower Institute has issued a final decision on the recertification of the Buffalo River Project located on the Buffalo River in Idaho. The 30-day appeal window closed on March 18, 2022 and no appeals were filed. Therefore, the decision to recertify the project is now final. The new term is November 28, 2021 through November 27, 2031, in accordance with the term extension that became effective January 1, 2022 in Revision 2.05 of the LIHI 2nd 版本認證手冊。
北安普誇項目,LIHI #69 OR – 已收到完整的重新認證申請
閱讀更多