最終決定 – 重新認證克羅克大壩項目,LIHI #127
2020 年 11 月 30 日
Medway、Orono 和 Stillwater 項目,LIHI #65、#66、#67 – 已收到完整申請
2020 年 12 月 1 日November 30, 2020: The decision to certify the Sawmill (#173), Cross Power (#174), Upper Gorham (#175) and Shelburne (#176) Projects became final after the close of the appeals period on November 27, 2020 with no appeals filed. The Certification term for each Project is from August 31, 2020 – August 30, 2025.
北安普誇項目,LIHI #69 OR – 已收到完整的重新認證申請
閱讀更多