2020 年 4 月 13 日2020年4月13日: The Low Impact Hydropower Institute has received a complete application for Low Impact Certification of the Dwight Hydroelectric Project. LIHI is seeking public comment on this application. Specifically, we are interested in knowing whether you think the Project meets the LIHI Low Impact Certification Criteria, as revised in the 2nd Edition Handbook. Please review the program and criteria in LIHI’s revised 手冊然後查看下面該項目的申請資料。
與特定 LIHI 標準(流量、水質、 魚道等等)將非常有幫助,但所有評論都會被考慮。意見可以透過電子郵件提交給研究所 評論@lowimpactHydro.org 請在主旨欄註明“Dwight Project Comments”,或郵寄至 Low Impact Hydropower Institute, 329 Massachusetts Avenue, Suite 6, Lexington, MA 02420。 評論必須在東部時間下午 5 點或之前收到 2020年6月12日 有待考慮。所有評論都將發佈到網站上,申請人將有機會回應。任何回覆也會公佈。
項目描述:
The Dwight Project (聯邦能源監管委員會 No. 10675, exempt) is located in the City of Chicopee in Hampden County, Massachusetts, at approximate river mile 1.2 on the Chicopee River.
The project works include a stone masonry 壩 with a crest elevation of 77.0 feet (胃腸疾病), an impoundment, a 運河 headgate house, a power canal, an intake structure for three operable 壓力管道,一個 發電站 with three operable turbine/generating units, a tailrace channel (44.5 feet NGVD) and appurtenant facilities.
該大壩建於大約1860 年,由 306 英尺長的 溢洪道 and abutments. The northern 鄰接 is constructed of cut stone and measures approximately 12 feet by 25 feet. The stone masonry overflow spillway is 15 feet high by 306 feet long, with a permanent crest elevation of 77.0 feet. The southern abutment is also constructed of cut stone, measures approximately 9 feet by 23 feet, and also serves as the north abutment of the headgate house. The dam creates and impoundment extending approximately 1,500 feet upstream with a surface area is approximately 32 acres.The canal headgate house is a brick structure on a concrete foundation, housing the six intake 蓋茲 that control the flow from the impoundment to the power canal. The southern abutment of the canal headgate house is constructed of cut granite. The six 頭 大門均為木結構,高 5.5 英尺,寬 8 英尺。每個門都配備有電動齒條和小齒輪操作器。
80 英尺寬的電力運河從 頭門 到 壓力水管 intake structure. The power canal extends another 1,500 feet further downstream where historically other industrial water users on the canal diverted the water from the downstream end of the canal. The south wall of the canal is of concrete and masonry construction while the north wall is formed from masonry and rock ledge. The canal is about 6 to 8-feet deep during normal operation.
The intake structure is constructed of concrete and measures approximately 69 feet by 22 feet. Steel trashracks span 54 feet of the north wall of the canal, across the three operable penstocks. A rail-mounted trash rake traverses the intake. Three float-activated, wooden, 8-feet-diameter gates are operated by rack-and-pinion operators. Three operable penstocks lead through a manufacturing complex to the existing units at the Project. The steel penstocks are 7 feet in diameter and 168 feet long.
The powerhouse was built in 1920 to contain three turbines-generator units that replaced the existing hydromechanical units at the site. The present generating capacity is 1.464 MW. The powerhouse was shut down in 1973, pending extensive repairs and was rehabilitated in 1980. The powerhouse was again shutdown in September 2013 and was not returned to full-time service until December 2016. The powerhouse contains three S. Morgan Smith turbines each with a nameplate capacity of 488 kW for a total capacity of 1.464 MW, averaging 3,493 MWh per year.

項目名稱 | 德懷特 |
擁有者 | Central Rivers Power, MA, LLC |
狀態 | 麻薩諸塞州 |
地點 | 奇科皮河,1.2 英里 |
裝置容量 | 1.464兆瓦 |
平均年發電量 | 3,493 兆瓦時 |
設施類型 | 河流的奔流 |
聯邦能源監管委員會編號 | 10675,1992年豁免 |
初步決定-塔拉西淺灘計畫重新認證,LIHI #12,GA