
初步決定 - Willow Island 專案認證,待 LIHI #187,OH/WV
2021年12月1日
初步決定 - 重新認證 Benton Falls 項目,LIHI #79,ME
2021年12月14日December 8, 2021: The Low Impact Hydropower Institute (LIHI) has received a complete recertification application from Fall River Rural Electric Cooperative for the Buffalo River Project located on the Buffalo River in Idaho.
LIHI 正在尋求對該申請的評論。與特定 LIHI 標準(流量、水質、 魚道等等)將非常有幫助,但所有評論都會被考慮。意見可以透過電子郵件提交給 LIHI,郵箱地址為 評論@lowimpactHydro.org with “Buffalo River Project Comments” in the subject line, or by mail addressed to the Low Impact Hydropower Institute, 1167 Massachusetts Avenue, Office 407, Arlington, MA 02476. Comments must be received at the Institute on or before 5 pm Eastern time on February 6, 2022 to be considered。所有評論都將發佈到網站上,申請人將有機會回應。任何回應也會發布。
項目描述和完整申請可以在這裡找到 這裡.
初步決定-塔拉西淺灘計畫重新認證,LIHI #12,GA
閱讀更多