Décision préliminaire – Certification du projet American Tissue, en attente LIHI #191, ME
5 juillet 2022
Collaboration entre le HSC et le LIHI
12 juillet 2022July 8, 2022: The Low Impact Hydropower Institute has issued a final decision on the recertification of the Island Park Project located on Henry’s Fork of the Snake River in Idaho. The 30-day appeal window closed on July 2, 2022 and no appeals were filed. Therefore, the decision to recertify the project is now final. The new term is December 29, 2021 through December 28, 2031 in accordance with the term extension that became effective January 1, 2022 in Revision 2.05 of the LIHI 2nd Manuel de certification des éditions.
Décision préliminaire – Recertification du projet Tallassee Shoals, LIHI #12, GA
En savoir plus